Business
LAURION Starts defining Gold Mineralization North and Northeast of the Brenbar Shaft, Highlighting 2.68 g/t Au over 1.05 m from 117.6 m to 118.65 m
(TheNewswire) Toronto, Ontario – November 4, 2025 – TheNewswire - LAU...

About this update from Laurion Mineral Exploration Inc.
[{"type":"text","content":"LAURION Starts defining Gold Mineralization North and Northeast of the Brenbar Shaft, Highlighting 2.68 g/t Au over 1.05 m from 117.6 m to 118.65 m\n\n\n (TheNewswire)\n \n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n Toronto, Ontario – November 4, 2025\n–\n \n\n TheNewswire -\n \n\n LAURION Mineral Exploration Inc. (TSX.V:\nLME | OTC: LMEFF) (“LAURION” or the “Corporation”)\n \n\n is pleased to announce encouraging results from\nits 7,700-metre Summer 2025 drill exploration program at the\n100%-owned Ishkõday Project, located 220 km northeast of Thunder Bay\nin Greenstone, Ontario. The first five drill results were announced in\nthe Corporation’s press releases dated August 19, 2025 and September\n23, 2025, respectively, which targeted the high-grade gold-bearing\nvein systems of the Sturgeon River Mine area. Reference is also made\nto the Corporation’s press releases dated September 5, 2025, May 27,\n2025 and May 8, 2025.\n \n\n\n\n The reported drill holes below, LME25-061 and\nLME25-062, totalling 954 m were designed to evaluate the mineralized\nsystem at the historic Brenbar Mine area, stepping out to the north\nand northeast of the of the historic mine shaft.\n \n\n\n\n Highlights of Drill Holes LME25-061\nand LME25-062\n \n\n\n\n LME25-061\n \n\n\n\n\n\n 2.70 m @ 0.22 g/t Au from 152.6 m to\n155.3 m\n \n\n\n\n\n\n 2.50 m @ 0.20 g/t Au from 167.5 m to\n170 m\n \n\n\n\n\n\n 2.25 m @ 0.88 g/t Au from 213.85 m to\n216.10 m, including 1.70 m @ 1.10 g/t Au from 214.4 m\n \n\n\n\n\n\n LME25-062\n \n\n\n\n\n\n 3.00 m @ 0.49 g/t Au from 304.0 m to\n307 m, including 1.0 m @ 1.34 g/t Au from 304.0 m\n \n\n\n\n\n\n 2.00 m @ 0.50 g/t Au from 111.0 m to\n113.0 m, including 0.5 m @ 1.45 g/t Au from 111.80 m\n \n\n\n\n\n\n 1.20 m @ 0.76 g/t Au from 105.7 m to\n106.9 m, including 0.7 m @ 1.07 g/t Au from 105.7 m\n \n\n\n\n\n\n 1.05 m @ 2.68 g/t Au from 117.6 m to\n118.65 m, including 0.5 m @ 5.18 g/t Au from 118.15 m\n \n\n\n\n\n\n 1.15 m @ 0.39 g/t Au from 310.7 m to\n311.85 m\n \n\n\n\n\n\n 1.10 m @ 1.63 g/t Au from 454.4 m to\n455.5 m\n \n\n\n\n\n\n These new intercepts not only\nconfirm the continuity of gold-bearing structures near the Brenbar\nShaft, but also demonstrate how far our understanding of\nIshk\n \n\n õ\n \n\n day has advanced since the early 2010\ndrilling campaigns,...