Business

LAURION Intersects 9.16 g/t Gold over 0.80 Metres and Releases Results for the First Three Drill Holes at Sturgeon River Mine Area

(TheNewswire) TORONTO, Ontario – TheNewswire - August 19, ...

articleLaurion Mineral Exploration Inc.August 19, 20254/company/laurion-mineral-exploration-inc/news/laurion-intersects-916-gt-gold-over-080-metres-and-releases-results-for-the-first-three-drill-holes-at-sturgeon-river-mine-area
LAURION Intersects 9.16 g/t Gold over 0.80 Metres and Releases Results for the First Three Drill Holes at Sturgeon River Mine Area

About this update from Laurion Mineral Exploration Inc.

[{"type":"text","content":"LAURION Intersects 9.16 g/t Gold over 0.80 Metres and Releases Results for the First Three Drill Holes at Sturgeon River Mine Area\n\n\n (TheNewswire)\n \n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n TORONTO, Ontario –\n \n\n\n\n TheNewswire -\n \n\n\n\n August 19, 2025\n \n\n\n – LAURION Mineral Exploration Inc.\n(TSXV: LME | OTCPINK: LMEFF) (“LAURION” or the “Corporation”)\n \n\n reports encouraging initial results from the\nfirst three diamond drill holes of its previously announced 2025 drill\nprogram at the Ishkõday\n \n\n Project, located 220 km\nnortheast of Thunder Bay, Ontario. Further to the Corporation’s\npress releases dated May 8, 2025 and May 27, 2025, drilling began in\nmid-May and is part of a 7,000-metre campaign targeting the high-grade\ngold-bearing vein systems of both the Brenbar and Sturgeon River Mine\nareas.\n \n\n\n\n\n Highlights from the\nfirst three drill holes at the Sturgeon River Mine area\ninclude:\n \n\n\n\n\n\n\n\n LME25-060:\n \n\n\n 9.16 g/t Au over 0.80\nm from 272.70 m to 273.50 m\n \n\n\n\n\n\n\n LME25-060:\n \n\n\n 3.16 g/t Au over 1.00\nm from 583.80 m to 584.30 m\n \n\n\n\n\n\n\n LME25-060:\n \n\n\n 3.13 g/t Au over 1.00\nm from 379.00 m to 380.00 m\n \n\n\n\n\n\n\n LME25-056:\n \n\n\n 3.07 g/t Au over 0.50\nm from 609.50 m to 610.00 m\n \n\n\n\n\n\n\n LME25-056:\n \n\n\n 3.03 g/t Au over 0.60\nm from 595.20 m to 595.80 m\n \n\n\n\n\n\n\n LME25-057:\n \n\n\n 1.31 g/t Au over 0.50\nm from 536.50 m to 537.00 m\n \n\n\n\n\n\n These intercepts confirm the continuity of multiple\ngold-bearing vein sets within the Sturgeon River Mine corridor, with\nsignificant grades encountered from near-surface zones to depths\nexceeding 600 metres. The results support the potential for both\ndiscrete high-grade shoots and broader mineralized envelopes along\nstrike and at depth.\n \n\n\n\n\n Drill Program\nContext\n \n\n\n\n\n\n\n\n The 2025 program is designed to:\n \n\n\n\n\n\n Test depth extensions beneath historic\nworkings;\n \n\n\n\n\n\n In-fill drill to improve geological\ncontinuity.\n \n\n\n\n\n\n Extend strike to the north and south; and\n \n\n\n\n\n\n Evaluate new zones to the northwest, including the M24\nand M25 vein systems.\n \n\n\n\n\n\n The first three drill holes, totaling 2,151 metres,\nsuccessfully intersected both\n \n\n known and previ...

More updates from Laurion Mineral Exploration Inc.