Business
LAURION Initiates 10,000 m Diamond Drilling Program at their Flagship Ishkoday Polymetallic Project
LAURION Initiates 10,000 m Diamond Drilling Program at their Flagship Ishkoday Polymetall...

About this update from Laurion Mineral Exploration Inc.
[{"type":"text","content":"\n \n \n \n LAURION Initiates 10,000 m Diamond Drilling Program at their Flagship Ishkoday Polymetallic Project\n \n \n /* Style Definitions */\nspan.prnews_span\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\na.prnews_a\n{\ncolor:blue;\n}\nli.prnews_li\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\np.prnews_p\n{\nfont-size:0.62em;\nfont-family:\"Arial\";\ncolor:black;\nmargin:0in;\n}\n.prntal{\nTEXT-ALIGN: LEFT\n}\n \n \n \n \n \n \n Canada NewsWire\n \n \n \n \n /THIS NEWS RELEASE IS INTENDED FOR DISTRIBUTION IN\n \n CANADA\n \n ONLY AND IS NOT INTENDED FOR DISTRIBUTION TO\n \n UNITED STATES\n \n NEWSWIRE SERVICES OR DISSEMINATION IN\n \n THE UNITED STATES\n \n ./\n \n \n \n TORONTO\n \n ,\n \n April 13, 2021\n \n /CNW/ -\n \n LAURION Mineral Exploration Inc.\n \n (TSXV: LME) (OTC-PINK: LMEFF)\n \n (\"LAURION\" or the \"Corporation\")\n \n is pleased to announce that it has commenced this 2021 season's\n \n 10,000m\n \n diamond drill hole program at its flagship property, Ishkoday, located in the Onaman -Tashota Greenstone Belt, 28km northeast of\n \n Beardmore\n \n , Ontario.\n \n \n \n Diamond Drill Program\n \n \n \n The objective of this initial\n \n 10,000m\n \n drilling campaign is the definition of the mineralized system which comprises the 2020 Niish discovery and the A-Zone (Behzik structure). Early results at the Niish structure in drill holes LME20-031which intercepted\n \n 70.65 m\n \n of 3.90 g/t Au, 6.46 g/t Ag, 0.25 % Cu, 0.40 % Zn from 325 -\n \n 423.25 m\n \n ; and LME20-030 which intercepted\n \n 18.50 m\n \n of 0.18 g/t Au, 14.64 g/t Ag, 0.21% Cu and 3.69% Zn from 141.50\n \n -160.00 m\n \n , showed the encouraging potential of this mineralized structure.\n \n \n The Niish and the Behzik shear zones are part of a set of third order parallel structures, delineating the southern and northern contact of an interpreted (from drilling and geophysics) dioritic intrusive plug. In addition to these two (2) parallel structures, a number of EW and NS mineralized subsidiary structures and veins have been identified through past surface exploration and drilling (See\n \n Figure 1\n \n ).  Both the Niish and Behzik structures are interpreted as the major fluid conduits bounded by the diorite contact and S2 foliation. This dilatational zone and the presence competent Fe-rich rocks represent...