Business

LAURION Commences Summer Exploration at the Ishkoday Project in Preparation for the Upcoming Diamond Drilling Program

LAURION Commences Summer Exploration at the Ishkoday Project in Preparation for the Upcomi...

articleLaurion Mineral Exploration Inc.June 4, 20193/company/laurion-mineral-exploration-inc/news/laurion-commences-summer-exploration-at-the-ishkoday-project-in-preparation-for-the-upcoming-diamond-drilling-program
LAURION Commences Summer Exploration at the Ishkoday Project in Preparation for the Upcoming Diamond Drilling Program

About this update from Laurion Mineral Exploration Inc.

[{"type":"text","content":"\n\n\n\nLAURION Commences Summer Exploration at the Ishkoday Project in Preparation for the Upcoming Diamond Drilling Program\n\n/* Style Definitions */\nspan.prnews_span\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\na.prnews_a\n{\ncolor:blue;\n}\nli.prnews_li\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\np.prnews_p\n{\nfont-size:0.62em;\nfont-family:\"Arial\";\ncolor:black;\nmargin:0in;\n}\n\n\n\n\n\n\n\nCanada NewsWire\nTORONTO, June 4, 2019\n\n\n\n/THIS NEWS RELEASE IS INTENDED FOR DISTRIBUTION IN CANADA ONLY AND IS NOT INTENDED FOR DISTRIBUTION TO UNITED STATES NEWSWIRE SERVICES OR DISSEMINATION IN THE UNITED STATES./\n TORONTO, June 4, 2019 /CNW/ - Laurion Mineral Exploration Inc. (TSX.V: LME) and (OTCPINK: LMEFF) (\"LAURION\" or the \"Corporation\") is pleased to announce the commencement of the summer 2019 exploration program (the \"Campaign\") on the Corporation's 47 km2 Ishkoday Project (\"Ishkoday\"), located 220 km northeast of Thunder Bay. \nThe Campaign forms part of 2018-2019 exploration initiated in May 2018 as a three-staged 18-month program with the strategic objective of outlining the bulk precious and base metals upside potential at Ishkoday. It is linked to the on-going Stage 2 program facilitating the confirmation of the lateral and cross-strike continuity of the mineralization. A 2-D and 3-D geology-mineralization model will be constructed in conjunction with the confirmation of the lateral and cross-strike continuity of the mineralization, thus providing Laurion a solid technical background model to initiate diamond drilling to prove the model as part of the Stage 3 program. \nThe Campaign started on May 21, and consists of mechanized outcrop stripping, power washing, geological mapping, channel sampling and assaying of an additional 3,000m in 5 stripped areas or lines (the \"Lines\"): (1) finishing up TR18-3, the SW extension of the Marge/\"F\" Veins system; (2) the historic past producing Sturgeon River Mine's No. 3 Quartz Vein and the nearby No.1, No. 2 and No. 8/11 Veins (TR19-1); (3) the Marge/\"F\" Quartz Vein system (TR19-2); (4) the CRK polymetallic sulphide vein (TR19-3); and (5) the \"A\" Zone polymetallic sulphide vein (TR19-4). Additional work will consist of detailed mapping of the SW, SE and NE sectors of the Target Area to confirm extensions of known and ne...

More updates from Laurion Mineral Exploration Inc.