Business

Stellar Africagold Updates Geological Interpretation of Tichka Est Gold Project, Morocco; Prepares 2023 Drill Program

(TheNewswire) Vancouver – TheNewswire - March 21, 2023 – Stellar ...

articleStellar Africagold, Inc.March 21, 20235/company/lalondejfstellarafricagoldcoms-org/news/stellar-africagold-updates-geological-interpretation-of-tichka-est-gold-project-morocco-prepares-2023-drill-program
Stellar Africagold Updates Geological Interpretation of Tichka Est Gold Project, Morocco; Prepares 2023 Drill Program

About this update from Stellar Africagold, Inc.

[{"type":"text","content":"Stellar Africagold Updates Geological Interpretation of Tichka Est Gold Project, Morocco; Prepares 2023 Drill Program\n \n \n (TheNewswire)\n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n Vancouver\n \n \n – TheNewswire -\n \n \n March 21, 2023 –\n \n \n Stellar AfricaGold Inc., (TSXV:SPX) (\"Stellar\" or\nthe \"Company\") is pleased to announce that advanced planning\nof the 2023 drilling program at Tichka Est Gold Project, Morocco is\nunderway. A drill program, which will focus on Structure B where\nrecent surface trenching returned very positive results including\nTrench MT1 which assayed\n \n \n 3.50\ng/t gold over 155.7 meters\n \n \n , is expected to\ncommence during Q2, 2023.\n \n \n \n \n A BIT ABOUT THE TICHKA EST B\nZONE\n \n \n \n \n The identified B Zone structures are within an\napproximately 1 km\n \n \n 2\n \n \n area of the 82 km\n \n \n 2\n \n \n total area of\nthe Tichka Est Gold Project. Over the past two years Stellar has built\nan 8.5-kilometer mountain access road and conducted extensive mapping,\nsampling and trenching focussing on the regions in and around the B\nZone. To date four significant zones of gold mineralization have been\ndiscovered with much of the overall project area still unexplored or\nsuperficially explored.\n \n \n \n \n At the B Zone several programs of mechanical and hand\ntrenches delivered a series of impressive assay results including\ntrenches MT1\n \n \n 3.5 g/t gold\n \n \n over\n \n \n 155.7 meters,\n \n \n MT2\n \n \n 1.52 g/t gold\n \n \n over\n \n \n 39.7 meters\n \n \n and\n \n \n 1.58\ng/t Au\n \n \n over\n \n \n 8.6 meters,\n \n \n MT3\n \n \n 1.27 g/t\ngold\n \n \n over\n \n \n 80 meters,\n \n \n T6B 3\n \n \n .4 g/t gold\n \n \n over\n \n \n 20 meters\n \n \n , T8B\n \n \n 3.4\ng/t\n \n \n gold over\n \n \n 17 meters\n \n \n , and\n \n \n T2B 4.56 g/t gold\n \n \n over\n \n \n 15 meters.\n \n \n (See historical news releases at\n \n \n www.stellarafricagold.com\n \n \n or on\n \n \n Sedar.com)\n \n \n The B Zone is the primary\nexploration target for 2023 although Stellar will continue\nreconnaissance exploration throughout the Tichka Est Gold Project\narea.\n \n \n \n \n UPDATED GEOLOGICAL INTERPRETATION OF\nB ZONE, TICHKA EST\n \n \n \n \n Following a detailed mapping and a structural survey\ninitiated in December 2022, a technical report with a compreh...

More updates from Stellar Africagold, Inc.