Business

Stellar AfricaGold Prepares 2023 Drill Campaign at Tichka Est, Morocco and Identifies New Exploration Targets; Investor Site Visits Concluded

(TheNewswire) Montreal – TheNewswire - December 16, 2022 – Stella...

articleStellar Africagold, Inc.December 16, 20224/company/lalondejfstellarafricagoldcoms-org/news/stellar-africagold-prepares-2023-drill-campaign-at-tichka-est-morocco-and-identifies-new-exploration-targets-investor-site-visits-concluded
Stellar AfricaGold Prepares 2023 Drill Campaign at Tichka Est, Morocco and Identifies New Exploration Targets; Investor Site Visits Concluded

About this update from Stellar Africagold, Inc.

[{"type":"text","content":"Stellar AfricaGold Prepares 2023 Drill Campaign at Tichka Est, Morocco and Identifies New Exploration Targets; Investor Site Visits Concluded\n \n \n (TheNewswire)\n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n Montreal –\n \n \n TheNewswire -\n \n \n December 16, 2022 –\n \n \n Stellar AfricaGold Inc., (TSXV:SPX) (\"Stellar\" or\nthe \"Company\") is pleased to announce that exploration\nactivities are continuing at Tichka-Est gold project in the Atlas\nMountain region of Morocco.\n \n \n \n \n 2023 Diamond Drill Campaign\n \n \n \n \n A field team composed of two experienced geologists and\nassistants is mapping the mineralization exposed by recent road cuts,\nand after interpretation the geological model for Tichka Est will be\nupdated to include newly identified areas of gold mineralization\nincluding the significant gold mineralisation related to the diorite\nsub-horizontal intrusion that is known to extend for several hundred\nmeters.\n \n \n \n \n As part of this mapping program the team is digging\nadditional trenches to confirm the presence of gold mineralisation\nidentified in the extension of the diorite intrusion which will expand\nthe 240-meter length of the trench in the diorite sill (refer to news\nrelease of October 4\n \n \n th\n \n \n , 2022 -\n \n \n Gold Associated to Dioritic Sill Grading\n3.5 G/T Gold across a True Width of 155.7 Meters\n \n \n ). Results of the current mapping and sampling will be\nannounced as soon as they are received, tabulated and interpreted.\n \n \n \n \n As a reminder, Structure B was initially interpreted as\nN80° trending gold structure extending over two kilometers along\nstrike at the contact of limestone and schist. The contact is highly\nsheared and injected by quartz-ankerite-calcite veins and veinlets\nwith traces of pyrite, chalcopyrite and arsenopyrite.\n \n \n \n \n Following the interpretation of these most recent\nmapping and trenching results, the Company will finalized drill target\nidentification and prepare for a diamond drill campaign in the second\nquarter of 2023.\n \n \n \n \n New Targets for 2023\nExploration\n \n \n \n \n Based on the recent mapping and sampling of recently\nidentified gold mineralized structures, Stellar’s geological team\nhas prioritized two targets, the first located West of Zone B and\ninterpreted as an extensio...

More updates from Stellar Africagold, Inc.