Business

Stellar AfricaGold Completes 11 New Trenches on Gold Mineralized Structures at Tichka Est Gold and Base Metals Project, Morocco

(TheNewswire) Montreal – TheNewswire - October 6 , 202...

articleStellar Africagold, Inc.October 6, 20213/company/lalondejfstellarafricagoldcoms-org/news/stellar-africagold-completes-11-new-trenches-on-gold-mineralized-structures-at-tichka-est-gold-and-base-metals-project-morocco
Stellar AfricaGold Completes 11 New Trenches on Gold Mineralized Structures at Tichka Est Gold and Base Metals Project, Morocco

About this update from Stellar Africagold, Inc.

[{"type":"text","content":"Stellar AfricaGold Completes 11 New Trenches on Gold Mineralized Structures at Tichka Est Gold and Base Metals Project, Morocco\n \n \n (TheNewswire)\n \n \n \n \n \n \n \n \n Montreal –\n \n \n TheNewswire -\n \n \n October\n \n \n 6\n \n \n ,\n2021 –\n \n \n Stellar AfricaGold Inc., (TSXV:SPX)\n(\"Stellar\" or the \"Company\") is pleased to\nannounce the completion of eleven new trenches on the Tichka Est Gold\nand Base Metals Project in Morocco.\n \n \n \n \n Exploration Program Increased at\nTichka Est, Morocco\n \n \n \n \n Stellar has proceeded with an infill trenching program\nbuilding upon the positive results from its first campaign completed\nduring the second quarter of this year on it 90% earn-in Tichka Est\nGold and Base Metals Project in Morocco.  This expanded program is\nheaded by Dr. Saquaque and his team which also conducted the earlier\nprogram.\n \n \n \n \n The general area of the Tichka Est project, which is\nin\n \n \n the High Atlas Mountain region approximately\n160-kilometres southwest of Marrakech, is accessible by existing\nwell-maintained national roads, Stellar is planning the construction\nof a new road to allow exploration vehicles and drill equipment to\naccess the specific drill ready structures at Zones A and B of the\nTichka Est permits.\n \n \n As previously announced\n \n \n (News Release July 8,\n2021)\n \n \n , exceptionally steep terrain and hard rock\nrequired that the access road to drill-ready Zones B and A gold\nstructures be re-routed including making applications for additional\nroad construction permits. Permitting for the new road construction is\nadvancing well and now that proposed route has been accepted in\nprinciple detailed surveying of the proposed route will be conducted\nin the coming weeks.\n \n \n \n \n The initial trenching of the Zones B and A gold\nstructures during Q2 of 2021 reported numerous mineralized\nintersections with grades as high as\n \n \n 3.36 g/t Au\n \n \n over\n \n \n 10.0 meters\n \n \n including an interval of\n \n \n 8.73 g/t Au\n \n \n over\n \n \n 3.0 meters\n \n \n in Zone A, and\n \n \n 4.55\ng/t Au\n \n \n over\n \n \n 15 meters\n \n \n including\nan internal of\n \n \n 7.47 g/t\nAu\n \n \n over\n \n \n 6.0 meters\n \n \n in Zone B. These very encouraging\nsurface results greatly justified the positioning of new infill and\n...

More updates from Stellar Africagold, Inc.