Business
Equitorial Commences Drill Program at Cat Lake Lithium Property, Manitoba
(via TheNewswire) Vancouver, BC, Canada / TheNewswire / February 15, 2018 -...

About this update from Lake Winn Resources Corp.
[{"type":"text","content":"Equitorial Commences Drill Program at Cat Lake Lithium Property, Manitoba(via TheNewswire)\n \n \n\n\n\n \nVancouver, BC, Canada / TheNewswire / February 15, 2018 - Equitorial Exploration Corp. (TSX-V: EXX, Frankfurt: EE1, OTCQB: EQTXF) (\"Equitorial\" or \"Company\") is pleased to report that the Company will commence drilling its 100%-owned Cat Lake Lithium Property directly adjacent to the Cat Lake Mineral Project owned by Quantum Minerals Corp. \n\n\n \nThe drill contract was awarded to Rodren Drilling Ltd. of West Paul, Manitoba. \n\n\n \nDrilling will commence the week of February 19, 2017.\n\n\n \nCat Lake Drill Program\n\n\n \nThe drill program will involve a total of 1,100 meters at a maximum depth of 300 meters per hole. Drilling will focus on the eastward strike extent of the Irgon Pegmatite presently being explored by Quantum Minerals. The Irgon Mine was an underground mining operation for spodumene (one of the hard rock sources for Li) from 1956-1957. The historic estimate was 1.2 million tons of 1.51% Li2O (Manitoba Government Assessment File 94932), not 43-101 compliant. In 1948, a drill hole on the company's present Cat Lake Project claims, encountered 48 feet (~14.6 metres) of spodumene (Manitoba Government assessment file 98073). This hole was not followed up at the time. \n\n\n \nThe drill program will be headed up by Carey Galeschuk. P. Geo, a consulting geologist with extensive experience in lithium bearing pegmatites. He will also serve as Qualified Person for the purpose of National Instrument 43-101. \n\n\n \nCat Lake Lithium Property Summary\n\n\n \n\n\n- Adjacent to Cat Lake Mineral Project (previously Irgon Lithium Mine)\n\n\n\n- Lithium Corp Cat Lake mine situated on south end Cat Lake claim block\n\n\n\n- Irgon Lithium Mine shaft 150 m from south end of Cat Lake claim block\n\n\n\n- 48 feet of spodumene bearing quartz drilled in 1948 (Manitoba Assessment File 98073)\n\n\n\n- Approximately 150km northeast of Winnipeg \n\n\n\n- Provincial Highway 314 in southeast Manitoba passes close by the claims\n\n\n\n\n \nPlease click for a maps of the claims: http://equitorialexploration.com/wp-content/uploads/2018/01/Cat-Lake-Claims-Maps-3.pdf\n\n\n \nCat Lake Mineral Project\n\n\n \nQMC Quantum Minerals Corp News Release September 7, 2017 reported:\n\n\n \n\"Between 1953-1954, the Lithium Corporation of Canada ...