Business
Kutcho Copper Drills 34.2m of 3.3% CuEq* (including 8.4m of 5.1% CuEq*); Metallurgical Test Work Underway
VANCOUVER, British Columbia, Oct. 18, 2018 (GLOBE NEWSWIRE) -- Kutcho Copper Corp. (TSXV: KC) (OTC: KCCFF) (“Kutcho Copper” or the “Company”) is pleased to anno

About this update from Kutcho Copper Corp
[{"type":"text","content":" VANCOUVER, British Columbia, Oct. 18, 2018 (GLOBE NEWSWIRE) -- Kutcho Copper Corp. (TSXV: KC) (OTC: KCCFF) (“Kutcho Copper” or the “Company”) is pleased to announce additional drill results from the Main deposit at its 100% owned Kutcho high grade copper-zinc project located in British Columbia. Drill holes KC18-235 to KC18-248 are distributed throughout the Main deposit and were primarily designed to collect metallurgical samples. These holes intersected all styles of mineralization, including exhalative, semi-massive and massive sulphide mineralization. These holes have also increased confidence in the mineral resource model. Highlights from the Main deposit include: KC18-235 with 15.6m of 2.58% Cu, 3.7% Zn, 56.7g/t Ag and 0.65g/t Au or 5.0% CuEq* (including 5.8m of 6.4% CuEq*) KC18-243 with 12.6m of 2.17% Cu, 2.1% Zn, 38.9g/t Ag and 0.29g/t Au or 3.6% CuEq* (including 8.3m of 4.6% CuEq*) KC18-245 with 34.2m of 2.17% Cu, 1.4% Zn, 35.7g/tAg and 0.38g/t Au or 3.3% CuEq* (including 8.4m of 5.1% CuEq* and including 14m of 4.1% CuEq*) KC18-247 with 10.4m of 3.44% Cu, 3.3% Zn, 48.1g/t Ag and 0.52g/t Au or 5.5% CuEq* (including 4.8m of 6.7% CuEq* Vince Sorace, President & CEO stated, “These drill holes continue to confirm the high-grade nature of mineralization at the Main deposit. We have now commenced our metallurgical program and continue to drive forward with all elements of the Feasibility Study, which remains on time, and on budget.” Hole ID From (m) To (m) Interval (m)* Cu % Zn % Ag g/t Au g/t CuEq % KC18-235 68.45 84.06 15.61 2.58 3.7 56.7 0.65 5.0 including 69.63 75.45 5.82 2.39 7.7 59.2 0.54 6.4 KC18-243 158.19 170.86 12.67 2.17 2.1 38.9 0.29 3.6 including 158.19 166.50 8.31 2.63 3.2 48.0 0.34 4.6 KC18-244 Engineering hole (Not Assayed) KC18-245 117.72 152.00 34.28 2.17 1.4 35.7 0.38 3.3 including 117.72 126.20 8.48 3.09 2.2 68.9 0.74 5.1 including 131.00 145.00 14.00 2.80 1.7 39.2 0.40 4.1 KC18-246 77.59 88.00 10.41 2.24 1.2 53.2 1.03 3.9 including 77.59 85.85 8.26 2.65 1.4 62.4 1.22 4.6 KC18-247 105.15 115.64 10.49 3.44 3.3 48.1 0.52 5.5 including 105.15 110.00 4.85 4.07 4.1 61.4 0.65 6.7 KC18-248 105.15 115.64 10.49 3.44 3.3 48.1 0.52 5.5 *True width estimated to be 85% length of intercepts.*CuEq = Copper Equivalent calculated using $2.75/t Cu, $1.10/t Zn, $17.00/Oz Ag, $1250/Oz Au. Metallurgical P...