Business

KORE drills 9.0m of 5.8 g/t gold including 1.5m of 32.2 g/t gold in final drill hole of Phase 1 drilling at Gold Creek

KORE drills 9.0m of 5.8 g/t gold including 1.5m of 32.2 g/t gold in final drill hole of Ph...

articleKore Mining Ltd.December 4, 20183/company/kore-mining-ltd/news/kore-drills-90m-of-58-gt-gold-including-15m-of-322-gt-gold-in-final-drill-hole-of-phase-1-drilling-at-gold-creek
KORE drills 9.0m of 5.8 g/t gold including 1.5m of 32.2 g/t gold in final drill hole of Phase 1 drilling at Gold Creek

About this update from Kore Mining Ltd.

[{"type":"text","content":"\n\n\n\nKORE drills 9.0m of 5.8 g/t gold including 1.5m of 32.2 g/t gold in final drill hole of Phase 1 drilling at Gold Creek\n\n/* Style Definitions */\nspan.prnews_span\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\na.prnews_a\n{\ncolor:blue;\n}\nli.prnews_li\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\np.prnews_p\n{\nfont-size:0.62em;\nfont-family:\"Arial\";\ncolor:black;\nmargin:0in;\n}\n.prngen1{\nBORDER-TOP:0pt; BORDER-RIGHT:0pt; BORDER-COLLAPSE: COLLAPSE; BORDER-BOTTOM:0pt; BORDER-LEFT:0pt\n}\n.prngen3{\nBORDER-TOP:black 0pt; BORDER-RIGHT:black 0pt; VERTICAL-ALIGN: BOTTOM; BORDER-BOTTOM:black 1pt solid; PADDING-LEFT:0.50em; BORDER-LEFT:black 0pt; PADDING-RIGHT:0.50em\n}\n.prngen2{\nBORDER-TOP:black 0pt; BORDER-RIGHT:black 0pt; VERTICAL-ALIGN: BOTTOM; BORDER-BOTTOM:black 1pt solid; TEXT-ALIGN: RIGHT; PADDING-LEFT:0.50em; BORDER-LEFT:black 0pt; PADDING-RIGHT:0.50em\n}\n.prngen4{\nBORDER-TOP:black 0pt; BORDER-RIGHT:black 0pt; VERTICAL-ALIGN: BOTTOM; BORDER-BOTTOM:black 0pt; TEXT-ALIGN: RIGHT; PADDING-LEFT:0.50em; BORDER-LEFT:black 0pt; PADDING-RIGHT:0.50em\n}\n.prngen6{\nBORDER-TOP:black 0pt; BORDER-RIGHT:black 0pt; VERTICAL-ALIGN: BOTTOM; BORDER-BOTTOM:black 1pt solid; TEXT-ALIGN: CENTER; PADDING-LEFT:0.50em; BORDER-LEFT:black 0pt; PADDING-RIGHT:0.50em\n}\n.prngen5{\nBORDER-TOP:black 0pt; BORDER-RIGHT:black 0pt; VERTICAL-ALIGN: BOTTOM; BORDER-BOTTOM:black 0pt; PADDING-LEFT:0.50em; BORDER-LEFT:black 0pt; PADDING-RIGHT:0.50em\n}\n.prntac{\nTEXT-ALIGN: CENTER\n}\n\n\n\n\n\n\n\nCanada NewsWire\nVANCOUVER, Dec. 4, 2018\n\n\n\nKORE hits gold in all holes, confirms 400m+ strike length of gold mineralization\n VANCOUVER, Dec. 4, 2018 /CNW/ - KORE Mining Ltd. (TSX VENTURE: KORE - \"KORE\" or the \"Company\") is pleased to announce fire assay results of all 4 holes of the Phase 1 drilling completed in 2018 on the Gold Creek gold exploration project located 2km NE of the town of Likely in the Cariboo – in the heart of British Columbia's historic \"Gold Rush\" district.\nHighlights\nHole GC18-39 intercepted 1.5 metres of 32.2 g/t gold, within an overall intercept of 9.0 metres of 5.8 g/t gold. Hole GC18-38 intercepted 10.3 metres of 0.9 g/t gold and 11.4 metres of 1.0 g/t gold. Confirms positive correlation in drill holes between elevated arsenic (>100 ppm) and anomalous gold and potential for a...

More updates from Kore Mining Ltd.