Business

Kootenay Silver Completes 2023 Program with 2,123 gpt Silver Over 1.54 Meters Within 501 gpt Silver Over 10.26 Meters at Columba High Grade Silver Project

Kootenay Silver Completes 2023 Program with 2,123 gpt Silver Over 1.54 Meters Within 501 gpt Silv...

articleKootenay Silver Inc.December 14, 20235/company/kootenay-silver-inc/news/kootenay-silver-completes-2023-program-with-2123-gpt-silver-over-154-meters-within-501-gpt-silver-over-1026-meters-at-columba-high-grade-silver-project
Kootenay Silver Completes 2023 Program with 2,123 gpt Silver Over 1.54 Meters Within 501 gpt Silver Over 10.26 Meters at Columba High Grade Silver Project

About this update from Kootenay Silver Inc.

[{"type":"text","content":"\n \n \n \n Kootenay Silver Completes 2023 Program with 2,123 gpt Silver Over 1.54 Meters Within 501 gpt Silver Over 10.26 Meters at Columba High Grade Silver Project\n \n \n /* Style Definitions */\nspan.prnews_span\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\na.prnews_a\n{\ncolor:blue;\n}\nli.prnews_li\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\np.prnews_p\n{\nfont-size:0.62em;\nfont-family:\"Arial\";\ncolor:black;\nmargin:0in;\n}\n.prngen2{\nPADDING-RIGHT:0.17em; PADDING-LEFT:0.17em; VERTICAL-ALIGN: MIDDLE; TEXT-ALIGN: CENTER; BORDER-TOP:black 0.5pt solid; BORDER-RIGHT:black 0.5pt solid; BORDER-BOTTOM:black 0.5pt solid; BORDER-LEFT:black 0.5pt solid\n}\n.prnrbrb0{\nBORDER-RIGHT:black 0pt\n}\n.prnml4{\nMARGIN-TOP:0em; MARGIN-RIGHT:0em; MARGIN-BOTTOM:0em; MARGIN-LEFT:0.33em !IMPORTANT\n}\n.prnsbbb0{\nBORDER-BOTTOM:black 0pt\n}\n.prnvab{\nVERTICAL-ALIGN: BOTTOM\n}\n.prnsbtb0{\nBORDER-TOP:black 0pt\n}\n.prnbcc{\nBORDER-COLLAPSE: COLLAPSE\n}\n.prnpr2{\nPADDING-RIGHT:0.17em\n}\n.prnsblb0{\nBORDER-LEFT:black 0pt\n}\n.prnpl2{\nPADDING-LEFT:0.17em\n}\n \n \n \n \n \n \n Canada NewsWire\n \n \n \n \n \n \n VANCOUVER, BC\n \n \n ,\n \n \n Dec. 14, 2023\n \n \n /CNW/ - K\n \n ootenay Silver Inc.\n \n (TSXV: KTN)\n \n (the \"Company\" or \"Kootenay\")\n \n is pleased to announce the balance of drilling results from its 2023 diamond drilling program at Columba Silver Project (\"Columba\") in\n \n Chihuahua, Mexico\n \n . The program totals 12-holes for a total of 3,052.8 meters designed to extend known mineralization on the \"D Vein\" target area at Columba. The results contained herein represent the final two drillholes for 2023. Kootenay has completed over 30,000 meters in 147 holes since 2019 and the current drilling at D Vein target provides strong justification for resumption of work in the new year.\n \n \n \n \n \n \n \n \n \n Kootenay's President & CEO,\n \n James McDonald\n \n states,\n \n \"This drill program has returned excellent results expanding on the size of high-grade D Vein silver mineralization. The zone is open in both strike directions and to depth exhibiting excellent potential for further expansion. It is very exciting to think of the potential when two of our easternmost holes leave the zone wide open with high grade holes of 501 and 532 gpt silver over true widths about 4 t...

More updates from Kootenay Silver Inc.