Business
Kootenay Adds Drill at Columba High-Grade Silver Project.
Kootenay Adds Drill at Columba High-Grade Silver Project. Canada NewsWire V...

About this update from Kootenay Silver Inc.
[{"type":"text","content":"\n \n \n \n Kootenay Adds Drill at Columba High-Grade Silver Project.\n \n \n /* Style Definitions */\nspan.prnews_span\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\na.prnews_a\n{\ncolor:blue;\n}\nli.prnews_li\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\np.prnews_p\n{\nfont-size:0.62em;\nfont-family:\"Arial\";\ncolor:black;\nmargin:0in;\n}\n.prnsbbb1{\nBORDER-BOTTOM:black 1pt\n}\n.prnsblb1{\nBORDER-LEFT:black 1pt\n}\n.prnsbtb1{\nBORDER-TOP:black 1pt\n}\n.prnpr2{\nPADDING-RIGHT:0.17em\n}\n.prnbcc{\nBORDER-COLLAPSE: COLLAPSE\n}\n.prnrbrb1{\nBORDER-RIGHT:black 1pt\n}\n.prnpl2{\nPADDING-LEFT:0.17em\n}\n.prnml4{\nMARGIN-TOP:0em; MARGIN-RIGHT:0em; MARGIN-BOTTOM:0em; MARGIN-LEFT:0.33em !IMPORTANT\n}\n \n \n \n \n \n \n Canada NewsWire\n \n \n \n \n \n \n VANCOUVER, BC\n \n \n ,\n \n \n June 27, 2024\n \n \n /CNW/ -\n \n Kootenay Silver Inc.\n \n (TSXV: KTN)\n \n (the \"Company\" or \"Kootenay\")\n \n is pleased to announce coring is underway with a second drill working at the Columba Project, Chihuahua state,\n \n Mexico\n \n .\n \n \n \n \n \n \n \n \n \n Current work is focused on extending known limits of \"D-Vein\" and the second drill is positioned to complement this goal by testing the southeastern extensions of \"B-Vein\" and \"B2-Vein\". The second drill will work southeastward along the B-Vein trend toward a priority target zone where surface mapping indicates \"D -Vein\" and the \"B-Vein\" trends intersect.\n \n \n The B-Vein trend lies along southeastern extension of the \"F-Vein\" and contains well mineralized veins as evidenced by previous intercepts. Drillhole CDH-20-082\n \n 1\n \n intercepted 4.6 meters averaging 1,186 gpt Ag from 184.5 meters downhole and a follow up hole, CDH-21-112\n \n 2\n \n encountered 2.0 meters core length averaging 1,050 gpt Ag from 212 meters downhole. True widths for both intercepts are estimated at 60-75% of core length. No drilling has been undertaken on B-Vein since 2022\n \n \n The current drilling program is designed to find the strike extent of D-Vein mineralization in preparation of infill drilling and a now fully funded follow up program of 20,000 meters, aimed to delineate a maiden resource expected in late 2024. The second drill will assist this goal initially before moving on to perform test extensions of other known vein intercepts and also init...