Business

Kodiak Drills High-Grade Mineralization from Surface at the Adit Zone Including 79m of 0.69% CuEq Ending in 27m of 1.62% CuEq

Vancouver, British Columbia--(Newsfile Corp. - September 2, 2025) - Kodiak Copper Corp. (TSX...

articleKodiak Copper Corp.September 2, 20255/company/kodiak-copper-corp/news/kodiak-drills-high-grade-mineralization-from-surface-at-the-adit-zone-including-79m-of-069percent-cueq-ending-in-27m-of-162percent-cueq
Kodiak Drills High-Grade Mineralization from Surface at the Adit Zone Including 79m of 0.69% CuEq Ending in 27m of 1.62% CuEq

About this update from Kodiak Copper Corp.

[{"type":"text","content":"Kodiak Drills High-Grade Mineralization from Surface at the Adit Zone Including 79m of 0.69% CuEq Ending in 27m of 1.62% CuEqVancouver, British Columbia--(Newsfile Corp. - September 2, 2025) - Kodiak Copper Corp. (TSXV: KDK) (OTCQB: KDKCF) (FSE: 5DD1)  (the \"Company\" or \"Kodiak\") announces additional drill results from the 2025 drill program at its 100% owned MPD copper-gold porphyry project in southern British Columbia. The program focused on short, near-surface infill and confirmation drill holes at the West, Adit, and South Zones using a combination of diamond and reverse circulation drilling (\"RC\"). Results from nine RC holes totaling 850 metres completed at the Adit Zone are presented herein.Highlights:Results confirm shallow, high-grade mineralization at the Adit Zone. Highlight drill intersections include: RC-AXE-25-026 intersected 0.63% Cu, 0.05 g/t Au and 4.13 g/t Ag (0.69% CuEq) over 78.6 metres from 0 metres to 78.6 metres, including a higher-grade interval of 1.59% Cu, 0.01 g/t Au and 4.29 g/t Ag (1.62% CuEq) over 26.8 metres from 51.8 metres to the end of hole at 78.6 metres.RC-AXE-25-028 intersected 0.42% Cu, 0.03 g/t Au and 3.44 g/t Ag (0.46% CuEq) over 93 metres from 7.6 metres to 100.6 metres, ending in mineralization. Drilling at the Adit Zone has intersected mineralization over a strike length of approximately 550 metres and the zone remains open in multiple directions The Adit Zone is open at depth and past drilling encountered mineralization to a depth of 350 metres (see November 19, 2024 news release). The current drill program was designed to test near-surface mineralization for resource modelling, with most holes ending in mineralization.Final results from the 2025 drill program are expected in late Q3. The drill hole data will support a Resource Estimate for the Adit Zone as part of the initial MRE for the MPD Project planned for Q4 2025. Claudia Tornquist, President and CEO of Kodiak said, \"The Adit Zone continues to deliver excellent grades close to surface as we advance and grow the MPD project. With our drilling to date, we were able to significantly extend the historic mineralized envelope at the Adit Zone and it is still open in multiple directions with the potential for further growth. This year's program was designed to infill and confirm shallow mineralization with short ho...

More updates from Kodiak Copper Corp.