Business
Drill Hole #2 Confirms Main Lode True Width 38.5 Meters (126 feet)
(via TheNewswire) March 26, 2019 / TheNewswire / Vancouver, British Columbia KLOND...

About this update from Klondike Silver Corp.
[{"type":"text","content":"Drill Hole #2 Confirms Main Lode True Width 38.5 Meters (126 feet)(via TheNewswire)\n \n \nMarch 26, 2019 / TheNewswire / Vancouver, British Columbia KLONDIKE SILVER (TSX-V: KS) has completed two diamond drill holes of their 26-hole program. The program was designed to explore the fault off-set of the Main Lode, at the start of the Company's unexplored \"Silver Mile\" (1.6 km) section of the Main Lode (vein system). Both holes have intersected the Main Lode with an average true width of approximately 38.5 meters (126 feet) which is consistent with the average true width of the Silvana portion of the Main Lode. Klondike's intersections contain several well brecciated zones containing calcite and siderite veining with sphalerite, pyrite and galena. Assay results are pending. A series of QA/QC samples (i.e. Certified Reference Material, blank and duplicate) have been added to the sample stream at regular intervals. They are being assayed by ActLabs in Kamloops which is an accredited laboratory (ISO/IEC 17025, Lab 790). The two intersections are similar in appearance to Main Lode drill hole intersections within the Silvana Mine workings. These new intersections are approximately 400 meters West of the old Silvana mine working. The strike length of the Main Lode has been traced by surface expression over the last 125 years and by the numerous mines located along and within the structure.\n\n \n \nMAIN LODE LOCATION: The SLOCAN MINING CAMP South Eastern B.C. \n\n\n \n(vein structure) 138 km (86 miles) North of Teck's Zinc Silver Lead smelter.\n\n \n \nLENGTH: 9 kilometers (5.6 miles) in total (East-West).\n\n\n \n 7 km (4 miles) (including \"Silver Mile 1.6 km) \n\n\n \n located in Klondike's 100 square kilometer land package. \n\n \n \nThe FOUR past producing mines located to the West of the Silver Mile on the Main Lode (Standard, Echo, Hecla and Mammoth) produced 831,670 tonnes per BC MINFILE:\n\n\n \nSilver 377 g/t (11.0 oz per ton) - total 313,000 kg\n\n\n \nLead 5.19 % - total 43 million kg\n\n\n \nZinc 6.56 % - total 55 million kg\n\n \n \nThe NINE past producing mines located on Klondike Silver's Land Package (Jennie Lind-Read, Carnation, Evening, Silvana, Hope-Ruth, Silversmith-Slocan Star, Slocan King, Richmond-Eureka and Freddie Lee) produced 964,678 tonnes per BC MINFILE:\n\n\n \nSilver 596 g/t (17.4 oz per ton) - total 574...