Business

Klondike Gold Drills from Surface 0.84 g/t Au over 29.0 meters and Deepest Intersection to Date Of 0.62 g/t Au over 58.0 meters to 214 meters at Lone Star Zone

VANCOUVER, BC / ACCESSWIRE / September 22, 2021 / Klondike Gold Corp. (TSXV:KG)(FRA:LBDP)(OTC...

articleKlondike Gold Corp.September 22, 20214/company/klondike-gold-corp/news/klondike-gold-drills-from-surface-084-gt-au-over-290-meters-and-deepest-intersection-to-date-of-062-gt-au-over-580-meters-to-214-meters-at-lone-star-zone
Klondike Gold Drills from Surface 0.84 g/t Au over 29.0 meters and Deepest Intersection to Date Of 0.62 g/t Au over 58.0 meters to 214 meters at Lone Star Zone

About this update from Klondike Gold Corp.

[{"type":"text","content":"Klondike Gold Drills from Surface 0.84 g/t Au over 29.0 meters and Deepest Intersection to Date Of 0.62 g/t Au over 58.0 meters to 214 meters at Lone Star ZoneVANCOUVER, BC / ACCESSWIRE / September 22, 2021 / Klondike Gold Corp. (TSXV:KG)(FRA:LBDP)(OTC PINK:KDKGF) (\"Klondike Gold\" or the \"Company\") is pleased to report results of 2021 Phase 2b diamond drilling at the Lone Star Zone on the Company's wholly owned 586 square kilometer Klondike District Project near Dawson City, Yukon Territory.Highlights from Phase 2b Lone Star Drilling:0.35 g/t Au over 150.0 meters from 7.0 meters to 157.0 meters in LS21-397 including0.74 g/t Au over 38.0 meters from 93.0 meters to 131.0 meters0.62 g/t Au over 58.0 meters from 156.0 meters to 214.0 meters in LS21-4020.84 g/t Au over 29.0 meters from 4.0 meters to 33.0 meters in LS21-399Peter Tallman, Klondike Gold's CEO comments, \"At ~200 meters vertical depth, these latest Phase 2b drill results from the Lone Star Zone intersected the deepest gold mineralization yet. In addition, the Lone Star Zone gold mineralization has demonstrated continuity along the downhill slope dip length over 350 meters distance. This is a substantial increase from 200 meters previously. All dimensions remain open, and we will soon be reporting the results of drill testing to the east. All these results will be incorporated into the forthcoming independent Technical Report as we work towards a maiden mineral resource.\"PHASE 2 DRILLINGPhase 2 drilling at the Lone Star Zone is complete. Results from the Lone Star area (Phase 2b) tested the downslope and potential down-dip extension of the Lone Star Zone with 13 holes totalling 2,661 meters are reported here. Results from the Lone Star ‘East' area (Phase 2a) tested the potential eastern extension of the Lone Star Zone with 12 holes totalling 1,222 meters, are still pending and due shortly. See Figure 1 for drill targets and Table 1 for assay results on the Phase 2b Drilling on the Lone Star Zone.See Figure 2 for a simplified cross section across the Lone Star Zone showing continuity of mineralization subparallel to the slope which includes deep hole LS21-397.Figure 1: Lone Star Zone Target Areas and 2021 Phase 2 Drill Holes.Figure 2: Cross section with LS21-397 gold intersection from surface to 150 meters vertical depth.Table 1: Significant Lone Star Zone Dril...

More updates from Klondike Gold Corp.