Business

Kingfisher Metals Reports 234 meters of 1.0% Copper Equivalent, within 558 meters of 0.64% CuEq at HWY 37 Project, Golden Triangle, British Columbia

VANCOUVER, BC / ACCESS Newswire / September 10, 2025 / Kingfisher Metals Corp. (TSXV:KFR)(FSE:970)(OTCQB:KGFMF) ("Kingfisher" or the "Company") is pleased to announce initial results from the 2025 drilling program at the HWY 37 Project. The 849 km ...

articleKingfisher PlcSeptember 10, 20256/company/kingfisher-plc/news/kingfisher-metals-reports-234-meters-of-10percent-copper-equivalent-within-558-meters-of-064percent-cueq-at-hwy-37-project-golden-triangle-british-columbia-1
Kingfisher Metals Reports 234 meters of 1.0% Copper Equivalent, within 558 meters of 0.64% CuEq at HWY 37 Project, Golden Triangle, British Columbia

About this update from Kingfisher Plc

[{"type":"text","content":"VANCOUVER, BC / ACCESS Newswire / September 10, 2025 / Kingfisher Metals Corp. (TSXV:KFR)(FSE:970)(OTCQB:KGFMF) ("Kingfisher" or the "Company") is pleased to announce initial results from the 2025 drilling program at the HWY 37 Project. The 849 km 2 HWY 37 Project is located within the Golden Triangle, British Columbia.","length":341,"tagName":"p"},{"type":"text","content":"HW-25-004 has returned one of the highest and longest grade copper-gold intercepts ever completed at the Williams porphyry copper-gold deposit. The drillhole intercepted 557.8 meters 1 of 0.29% copper, 0.30 g/t gold, and 1.6 g/t silver (0.64% CuEq) 2 (Table 1). Importantly this hole highlights a body of strong bornite mineralization demonstrating the potential for additional high-grade porphyry copper gold deposits at the HWY 37 Project. Highlights include:","length":461,"tagName":"p"},{"type":"list","items":[{"val":[{"type":"text","content":"HW-25-004 : 557.8 meters at 0.64% CuEq from 328.10 meters","length":57,"tagName":"p"},{"type":"list","items":[{"val":[{"type":"text","content":"Including 234.35 meters at 1.00% CuEq from 328.10 meters","length":56,"tagName":"p"}]}],"tagName":"ul","bulletedList":true,"length":56,"olType":false}]}],"tagName":"ul","bulletedList":true,"length":113,"olType":false},{"type":"text","content":"Dustin Perry, CEO of Kingfisher, states "In these initial drill results we see clear confirmation of our exploration concepts - consistent vertical grade and expansion of the bornite-rich stockwork. The new data de-risks the broader project targets, justifies future drill meters, and strengthens our conviction that we're advancing a value-creating asset for shareholders."","length":388,"tagName":"p"},{"type":"text","content":"HW-25-004 Summary","length":17,"tagName":"p"},{"type":"text","content":"HW-25-004 was collared at 169 o degrees and -75 o dip (Figure 1 & 2), upslope and north of potassic alteration at Williams. After passing through the Williams thrust fault at 327 meters (m), the drill cut into copper-bearing potassic alteration ( Figure 3). Well-developed potassic alteration with chalcopyrite-bornite-diginite is present from 328 to 805 m downhole with chalcopyrite-dominant mineralization from 805 to end of hole at 885.9 m. Bornite occurs at surface at the discovery outcrop 1040 m elevation (m e...

More updates from Kingfisher Plc

HWY 37 ProjectBritish ColumbiaKingfisherWilliamsgold depositsEast Williams