Business

Kingfisher Metals Reports 889.35 meters of 0.47% CuEq and 721.7 meters of 0.46% CuEq from surface at Williams, HWY 37 Project, Golden Triangle, British Columbia

VANCOUVER, BC / ACCESS Newswire / January 13, 2026 / Kingfisher Metals Corp. (TSXV:KFR)(FSE:97...

articleKingfisher Metals CorpJanuary 13, 20263/company/kingfisher-metals-corp/news/kingfisher-metals-reports-88935-meters-of-047percent-cueq-and-7217-meters-of-046percent-cueq-from-surface-at-williams-hwy-37-project-golden-triangle-british-columbia
Kingfisher Metals Reports 889.35 meters of 0.47% CuEq and 721.7 meters of 0.46% CuEq from surface at Williams, HWY 37 Project, Golden Triangle, British Columbia

About this update from Kingfisher Metals Corp

[{"type":"text","content":"Kingfisher Metals Reports 889.35 meters of 0.47% CuEq and 721.7 meters of 0.46% CuEq from surface at Williams, HWY 37 Project, Golden Triangle, British ColumbiaVANCOUVER, BC / ACCESS Newswire / January 13, 2026 / Kingfisher Metals Corp. (TSXV:KFR)(FSE:970)(OTCQB:KGFMF) (\"Kingfisher\" or the \"Company\") is pleased to announce further results from the 2025 exploration and drilling program at the HWY 37 Project. The 933 km 2 HWY 37 Project is located within the Golden Triangle, British Columbia.Assay results have been received for an additional three diamond drill holes HW-25-008, -009, and -010. Diamond drill holes HW-25-008 and -010 returned some of the longest copper intercepts from within the Williams porphyry copper-gold system. HW-25-008 cut 889.35 m 1 of 0.47% CuEq 2 starting at surface below 3.65 m of cover to end of hole at 893 m (Figure 4) . Drillhole HW-25-010 returned 721.7 m of 0.46% CuEq starting below 4.3 m of cover which includes 78.7 m of 1.01% CuEq from 4.3 m depth (Figure 7). These drillholes demonstrate continuity of grade with mineralization from surface of bedrock to depth within the Williams deposit.Highlights from this release include:HW-25-008 (Williams): 889.35 m of 0.47% CuEq from 3.65 mIncluding 40.15 m at 1.16% CuEq from 287.95 mHW25-010 (Williams): 721.7 m of 0.46% CuEq from 4.3 mIncluding 78.7 m of 1.01% CuEq from 4.3 mIncluding 47.55 m of 1.12% CuEq from 273.0 m\"The Williams drilling continues to demonstrate a well-mineralized porphyry system with copper-gold mineralization extending from surface over long intervals,\" said Dustin Perry, CEO of Kingfisher. \"While Williams is interpreted as a satellite to a larger porphyry system at Hank, the presence of bornite and localized higher-grade intervals highlights the fertility of the broader system. These results provide geological context for the Hank porphyry system identified in the final hole of the program (HW-25-011), with results expected to be released in the near term.\"Table 1. Drill Results from this Release.Hole No.From (m)To (m)Interval (m) 1Cu (%)Au (g/t)Ag (g/t)CuEq (%) 2AuEq (g/t) 2HW-25-0083.65893.0889.350.210.221.50.470.43incl.287.95328.1040.150.460.622.51.161.06HW-25-00949.3322.0272.70.110.154.00.310.29HW-25-0104.3726.0721.70.220.211.30.460.42incl.4.383.078.70.430.503.01.010.93incl.273.0320.5547.550.490.561.91.121.03 Figure 1: Plan ...

More updates from Kingfisher Metals Corp