Business
Kenorland Announces 2022 Summer Exploration Results from the Frotet Project, Quebec
Vancouver, British Columbia--(Newsfile Corp. - November 14, 2022) - Kenorland Minerals Ltd. ...

About this update from Kenorland Minerals Ltd.
[{"type":"text","content":"Kenorland Announces 2022 Summer Exploration Results from the Frotet Project, QuebecVancouver, British Columbia--(Newsfile Corp. - November 14, 2022) - Kenorland Minerals Ltd. (TSXV: KLD) (OTCQX: KLDCF) (FSE: 3WQ0) (\"Kenorland\" or \"the Company\") is pleased to announce final drill results from the 2022 summer drill program at the Frotet Project, (\"the Project\"), located in northern Quebec and held under joint venture (\"the Joint Venture\") with Sumitomo Metal Mining Canada Ltd. (\"SMMCL\"). Assays from 23 drill holes (11,903 meters) completed at Regnault along with 8 drill holes (2,511 meters) completed at Cressida are reported herein. The Company is also pleased to provide an update on its plans for future exploration activities at the Project.Drill Highlights:22RDD136: 20.55m at 2.80 g/t Au incl. 3.50m at 10.72 g/t Au at R6 (2022 discovery)22RDD141A: 20.79m at 2.78 g/t Au incl. 1.50m at 15.28 g/t Au at R7 (2022 discovery)22RDD144: 2.91m at 31.52 g/t Au incl. 0.34m at 253.50 g/t Au at R5 (2022 discovery)22RDD144: 1.85m at 31.75 g/t Au incl. 0.33m at 147.80 g/t Au at R6 (2022 discovery)22RDD149: 29.20m at 16.61 g/t Au incl. 9.85m at 44.89 g/t Au at R1 (Metallurgical drill hole, twinned 20RDD007)Figure 1. Plan map of Regnault drilling including highlights from the 2022 summer drill programTo view an enhanced version of this graphic, please visit:https://images.newsfilecorp.com/files/6489/143892_bc89c811e4087be7_001full.jpgZach Flood, President and CEO of Kenorland, commented, \"the summer drill programs at the Frotet Project were a great success. At Regnault we have extended the R1 system over 100m to the east, for a total of over one kilometer of strike, remaining open. We have also begun to prove continuity along the recently discovered parallel vein structures, including R5, R6, R7, and R8, located just to the south of the R1. At the Cressida Target, our maiden drill program discovered gold mineralisation over three kilometers away and along strike from Troilus Gold's Southwest Zone. We anticipate the next phase of exploration in Q1 2023 to include up to 25,000m of drilling at Regnault which will be primarily focused on additional step-outs on the R1, R5, R6, R7, and R8 veins, as well as deeper drilling to test for additional parallel vein structures.\"Regnault Summer Drill Program11,903m of diamond drilling, including 23...