Business
K92 Mining Announces Filing of Amended Technical Reports for Blue Lake Mineral Resource Estimate and Updated Kainantu Gold Mine Definitive Feasibility Study
VANCOUVER, British Columbia, March 31, 2025 (GLOBE NEWSWIRE) -- K92 Mining Inc . (“ ...

About this update from K92 Mining, Inc.
[{"type":"text","content":"K92 Mining Announces Filing of Amended Technical Reports for Blue Lake Mineral Resource Estimate and Updated Kainantu Gold Mine Definitive Feasibility Study\n\n\n\n VANCOUVER, British Columbia, March 31, 2025 (GLOBE NEWSWIRE) --\n \n K92 Mining Inc\n \n . (“\n \n K92\n \n ” or the “\n \n Company\n \n ”) (TSX:\n \n KNT\n \n ; OTCQX:\n \n KNTNF\n \n ) announces that it has filed amended technical reports (the “\n \n Amended Updated DFS Technical Report\n \n ” and the “\n \n Amended Blue Lake Technical Report\n \n ”) for its Blue Lake Porphyry Deposit (the “\n \n Blue Lake Deposit\n \n ”) and its Kainantu Gold Mine Project (the “\n \n Kainantu Project\n \n ”) in Papua New Guinea, as part of a continuous disclosure review completed by the British Columbia Securities Commission. The Company previously filed the following technical reports:\n \n\n\n report titled, “Independent Technical Report, Mineral Resource Estimate Blue Lake Porphyry Deposit, Kainantu, Papua New Guinea” September 20, 2022, with an effective date of August 1, 2022, prepared by Simon Tear BSc (Hons), EurGeol, PGeo IGI, and Anthony Woodward BSc (Hons), M.Sc. (the “\n \n September 2022 Blue Lake Technical Report\n \n ”); and\n \n\n\n\n report titled, “Independent Technical Report, Kainantu Gold Mine, Updated Integrated Development Plan, Kainantu Project, Papua New Guinea” dated November 28, 2024, with an effective date of January 1, 2024, prepared by Qualified Persons, Andrew Kohler BAppSc (Geol), PGCert (Geostatistics), MAIG; Simon Tear BSc (Hons), EurGeol, PGeo (IGI); Brendan Mulvihill MAusIMM (CP Met), RPEQ; Daniel Donald BEng (Hons) (Mining), MBA, FAusIMM, MSME; Dr. Evan Kirby BSc (Hons), FSAIMM; Isaac Ahmed P.Eng; Ralph Holding CPEng, FIEAust; and Nicholas Currey MAusIMM (the “\n \n November 2024 Kainantu Technical Report\n \n ”).\n \n\n\n The Amended Blue Lake Technical Report supersedes and replaces the September 2022 Blue Lake Technical Report and reflects the removal of the copper equivalent inferred resource calculation, and the incorporation of metallurgical recoveries assumptions based on an analogous deposit in the gold equivalent calculation formula. Given the updated gold equivalent formula and the use of a gold eq...