Business
K92 Mining Announces 2025 Q4 and Annual Financial Results – Record Annual Net Cash Balance, Revenue, Net Earnings, Operating Cash Flow and EBITDA; Annual Production at Upper Half of Guidance, Cash Cost and AISC Better Than Guidance
VANCOUVER, British Columbia, March 02, 2026 (GLOBE NEWSWIRE) -- K92 Mining Inc. (“K92” or the “Company”) (TSX: KNT; OTCQX: KNTNF) is pleased to announce financial results for the three and twelve months ended December 31, 2025. ProductionFourth Quarter 2025 Strong quarterly production of 47,178 ounces gold equivalent (“AuEq”)(1) or 44,129 oz gold, 1,940,781 lbs copper and 47,427 oz silver.Cash costs of US$768/oz gold, and all-in sustaining costs (“AISC”) of US$1,619/oz gold (3).Record quarterly
About this update from K92 Mining, Inc.
[{"type":"image","alt":"K92 Mining Inc.","displaySize":"","headline":null,"caption":"K92 Mining Inc.","className":"","disableSlideshowImg":false,"size":{"original":{"width":213,"height":170,"url":"https://media.zenfs.com/en/globenewswire.com/aa8e243b1263919848e8f0532644d085"},"resized":{"url":"https://s.yimg.com/ny/api/res/1.2/gRUiACwcR4ZgdTfD5oJoPQ--/YXBwaWQ9aGlnaGxhbmRlcjt3PTQyMDtoPTMzNTtjZj13ZWJw/https://media.zenfs.com/en/globenewswire.com/aa8e243b1263919848e8f0532644d085","width":213,"height":170}},"lazy":false},{"type":"text","content":"VANCOUVER, British Columbia, March 02, 2026 (GLOBE NEWSWIRE) -- K92 Mining Inc. (“K92” or the “Company”) (TSX: KNT; OTCQX: KNTNF) is pleased to announce financial results for the three and twelve months ended December 31, 2025.","length":227,"tagName":"p"},{"type":"text","content":"ProductionFourth Quarter 2025","length":30,"tagName":"p"},{"type":"list","items":[{"val":[{"type":"text","content":"Strong quarterly production of 47,178 ounces gold equivalent (“AuEq”)(1) or 44,129 oz gold, 1,940,781 lbs copper and 47,427 oz silver.","length":134,"tagName":"p"}]},{"val":[{"type":"text","content":"Cash costs of US$768/oz gold, and all-in sustaining costs (“AISC”) of US$1,619/oz gold (3).","length":91,"tagName":"p"}]},{"val":[{"type":"text","content":"Record quarterly ore processed of 186,198 tonnes, a 93% increase from Q4 2024, with a head grade of 8.0 grams per tonne (“g/t”) AuEq, or 7.4 g/t gold, 0.5% copper and 10 g/t silver, with a moderate positive gold and copper grade reconciliation versus the latest independent mineral resource estimate (September 12, 2023 effective date for Kora and Judd).","length":354,"tagName":"p"}]},{"val":[{"type":"text","content":"Strong metallurgical recoveries in Q4 of 94.3% for gold and 93.9% for copper, exceeding the updated definitive feasibility study (“Updated DFS”) recovery parameters for gold (92.6%) and performing in line for copper (94.2%) (January 1, 2024 effective date). The new 1.2 million tonnes-per-annum Stage 3 Expansion Process Plant has performed well, commissioning was completed in December and, as at the end of October, all material was processed exclusively through the new plant.","length":479,"tagName":"p"}]},{"val":[{"type":"text","content":"Record quarterly total material mined (ore plus waste) of 404,205 tonnes and record quarterly ore mined of 157,882 tonnes, benef...