Business

K2 Gold Announces Approval of Mojave Project Exploration Drilling Program

VANCOUVER, British Columbia, July 13, 2020 (GLOBE NEWSWIRE) -- K2 Gold Corporation (“K2” or the “Company”) (TSX-V: KTO; OTCQB: KTGDF; FRANKFURT: 23K) is pleased

articleK2 Gold CorporationJuly 13, 20204/company/k2-gold-corporation/news/k2-gold-announces-approval-of-mojave-project-exploration-drilling-program
K2 Gold Announces Approval of Mojave Project Exploration Drilling Program

About this update from K2 Gold Corporation

[{"type":"text","content":" VANCOUVER, British Columbia, July 13, 2020 (GLOBE NEWSWIRE) -- K2 Gold Corporation (“K2” or the “Company”) (TSX-V: KTO; OTCQB: KTGDF; FRANKFURT: 23K) is pleased to report that it has received approval from the Bureau of Land Management (“BLM”) for its Phase 1 drill program at the Mojave project (“Mojave”) located in Inyo County, Southern California. Highlights of the Mojave Project Exploration Drilling Fully permitted and financed drill program expected to begin in August The Phase 1 drill program anticipates completion of 16 holes from four locations at the Dragonfly and Newmont target areas The total meterage of drilling is expected to be approximately 3,200m “We are excited to report that shortly we will begin the Phase 1 drill program at Mojave – a high grade oxide gold project which has not been drilled since the mid-1990s by BHP,” stated Stephen Swatton, President and CEO of K2.  “This fully financed drilling campaign will target prospective locations at Dragonfly and Newmont, and is expected to lay the groundwork for a next phase of land accessible drilling for which an application has already been filed with the BLM.” Please CLICK HERE to view map of Mojave and drill sites related to this news release. PDF.js viewer Thumbnails Document Outline Attachments Layers Current Outline Item Previous Next Highlight All Match Case Match Diacritics Whole Words Color Size Color Thickness Opacity Open Print Save Presentation Mode Current Page Go to First Page Go to Last Page Rotate Clockwise Rotate Counterclockwise Text Selection Tool Hand Tool Page Scrolling Vertical Scrolling Horizontal Scrolling Wrapped Scrolling No Spreads Odd Spreads Even Spreads Document Properties… Toggle Sidebar Find Previous Next Open Print Save Text Draw Tools Zoom Out Zoom In Automatic Zoom Actual Size Page Fit Page Width 50% 75% 100% 125% 150% 200% 300% 400% Enter the password to open this PDF file: Cancel OK File name: - File size: - Title: - Author: - Subject: - Keywords: - Creation Date: - Modification Date: - Creator: - PDF Producer: - PDF Version: - Page Count: - Page Size: - Fast Web View: - Close Preparing document for printing… 0% Cancel Phase 1 Drill Program The Phase 1 drilling will be by Reverse Circulation (“RC”) and will be conducted on the gold rich eastern side of K2’s 5,830 ha property.  The RC drilling will target structurally ...

More updates from K2 Gold Corporation