Business
Traction Uranium Announces Spring Exploration Plans for the Aurora Project in the Southeastern Athabasca Basin
Targeting near-surface uranium potential across a 17 km strike with advanced geophysics in a proven Athabasca Basin corridorCALGARY, Alberta, April 27, 2026 (GLOBE NEWSWIRE) -- Traction Uranium Corp. (CSE: TRAC) (OTC: TRCTF) (FRA: Z1K) (the “Company” or “Traction”) is pleased to announce its planned spring exploration program at the Aurora Project (“Aurora” or the “Project”) in Saskatchewan’s Athabasca Basin region, where the Company intends to complete an airborne radiometric survey across the
About this update from Cosa Resources Corp.
[{"type":"image","alt":"Traction Uranium Corp.","displaySize":"","headline":null,"caption":"Traction Uranium Corp.","className":"","disableSlideshowImg":false,"size":{"original":{"width":195,"height":44,"url":"https://media.zenfs.com/en/globenewswire.com/be4681c9b3a18e846c94353324d291af"},"resized":{"url":"https://s.yimg.com/ny/api/res/1.2/g.pwidZamNwkygfcdY9FqA--/YXBwaWQ9aGlnaGxhbmRlcjt3PTM2MDtoPTgx/https://media.zenfs.com/en/globenewswire.com/be4681c9b3a18e846c94353324d291af","width":195,"height":44}},"lazy":false},{"type":"text","content":"Targeting near-surface uranium potential across a 17 km strike with advanced geophysics in a proven Athabasca Basin corridor","length":124,"tagName":"p"},{"type":"text","content":"CALGARY, Alberta, April 27, 2026 (GLOBE NEWSWIRE) -- Traction Uranium Corp. (CSE: TRAC) (OTC: TRCTF) (FRA: Z1K) (the “Company” or “Traction”) is pleased to announce its planned spring exploration program at the Aurora Project (“Aurora” or the “Project”) in Saskatchewan’s Athabasca Basin region, where the Company intends to complete an airborne radiometric survey across the project land package. The Company holds an option to acquire an 80% interest in Aurora from Cosa Resources Corp. (“Cosa”), the project’s underlying owner and operator, subject to the satisfaction of certain earn-in requirements. Aurora spans approximately 17 kilometres of prospective strike along the southeastern margin of the Athabasca Basin and is located about 16 kilometres east of the Key Lake uranium mill and past-producing mine, in an area where historical exploration indicates shallow to locally absent sandstone cover. The Company believes these characteristics support the potential for near-surface uranium discoveries and provide Aurora with strategic significance as an exploration project in proximity to existing regional infrastructure.","length":1132,"tagName":"p"},{"type":"text","content":"The survey will be designed to evaluate the Project for radioactive anomalies at a property-wide scale and to support the prioritization of existing targets while also generating additional areas for follow-up. Results from the airborne program are expected to help refine the Company’s exploration focus for the remainder of the 2026 field season, including ground truthing and other potential follow-up work. This program builds on prior exploration completed on Aurora, includ...