Business
Malaysia Drilling and Corporate Update
Malaysia Drilling and Corporate Update.

About this update from Jadestone Energy Plc
[{"type":"text","content":"\n\n\n\n \nStrong Results from Malaysia Drilling Campaign and Corporate Update\n \n4 December 2023 - Singapore: Jadestone Energy plc (\"Jadestone\", the \"Company\" or the \"Group\") an independent upstream production company focused on the Asia-Pacific region, announces that the final well in the Company's 2023 East Belumut field drilling campaign offshore Peninsular Malaysia has now been completed. The overall programme has delivered results significantly ahead of expectations. The Company is also pleased to provide an update on Group production, progress on the Akatara project and recent crude oil liftings.\n \nEast Belumut Infill Drilling Campaign (Jadestone 60% working interest and operator)\n \nThe fourth and final well in the East Belumut infill drilling campaign is currently being tested after reaching c.4,600 metres measured depth in the south west of the field. This is approximately 730 metres measured depth more than originally planned, due to the better than expected oil column encountered at the toe of the well, and the longest reach horizontal well ever drilled in the field. Overall, a 1,700 metre horizontal section was drilled in the target formation, aided by successful optimisation of the well trajectory using geo-steering tools. The well is expected to produce at initial rates in excess of 3,500 bbls/d.\n \nCombined with the three wells drilled to date, which are currently producing at an aggregate gross rate of c.7,000 bbls/d, the results of the East Belumut infill campaign have far exceeded expectations, which were for initial gross aggregate rates from all four wells of 3,500 bbls/d. The drilling capex will be cost recovered and pay-back is expected by Q2 2024 next year. The well results are already being used to update the geological model for the East Belumut field, will have a positive impact on reserves, and are likely to provide a number of new infill targets for future drilling campaigns.\n \nGroup Production Update\n \nSince the Company's most recent announcement on 13 November 2023, overall group production performance has continued to be robust, averaging c.20,000 boe/d during this period. The main factors driving this positive outcome are:\n \n· Recent average production of c.7,000 boe/d net (11,200 boe/d ...