Business
IsoEnergy Intersects Uranium Mineralization at Larocque East
IsoEnergy Intersects Uranium Mineralization at Larocque East Canada NewsWire VAN...

About this update from Isoenergy Ltd.
[{"type":"text","content":"\n\n\n\nIsoEnergy Intersects Uranium Mineralization at Larocque East\n\n/* Style Definitions */\nspan.prnews_span\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\na.prnews_a\n{\ncolor:blue;\n}\nli.prnews_li\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\np.prnews_p\n{\nfont-size:0.62em;\nfont-family:\"Arial\";\ncolor:black;\nmargin:0in;\n}\n.prngen3{\nBORDER-TOP:black 0pt; BORDER-RIGHT:black 0pt; VERTICAL-ALIGN: BOTTOM; BORDER-BOTTOM:black 1pt solid; PADDING-LEFT:0.50em; BORDER-LEFT:black 0pt; PADDING-RIGHT:0.50em\n}\n.prngen8{\nBORDER-TOP:black 0pt; BORDER-RIGHT:black 0pt; VERTICAL-ALIGN: BOTTOM; BORDER-BOTTOM:black 2pt double; TEXT-ALIGN: RIGHT; PADDING-LEFT:0.50em; BORDER-LEFT:black 0pt; PADDING-RIGHT:0.50em\n}\n.prngen4{\nBORDER-TOP:black 0pt; BORDER-RIGHT:black 0pt; VERTICAL-ALIGN: BOTTOM; BORDER-BOTTOM:black 0pt; TEXT-ALIGN: LEFT; PADDING-LEFT:0.50em; BORDER-LEFT:black 0pt; PADDING-RIGHT:0.50em\n}\n.prngen5{\nBORDER-TOP:black 0pt; BORDER-RIGHT:black 0pt; VERTICAL-ALIGN: BOTTOM; BORDER-BOTTOM:black 0pt; TEXT-ALIGN: RIGHT; PADDING-LEFT:0.50em; BORDER-LEFT:black 0pt; PADDING-RIGHT:0.50em\n}\n.prnsbb0{\nBORDER-BOTTOM:0pt\n}\n.prnpr6{\nPADDING-RIGHT:0.50em\n}\n.prnsbr0{\nBORDER-RIGHT:0pt\n}\n.prnvab{\nVERTICAL-ALIGN: BOTTOM\n}\n.prnsbt0{\nBORDER-TOP:0pt\n}\n.prnsbl0{\nBORDER-LEFT:0pt\n}\n.prnsblb0{\nBORDER-LEFT:black 0pt\n}\n.prnrbrb0{\nBORDER-RIGHT:black 0pt\n}\n.prntal{\nTEXT-ALIGN: LEFT\n}\n.prnsbbd{\nBORDER-BOTTOM:black 2pt double\n}\n.prnsbtb0{\nBORDER-TOP:black 0pt\n}\n.prnbcc{\nBORDER-COLLAPSE: COLLAPSE\n}\n.prntac{\nTEXT-ALIGN: CENTER\n}\n.prnpl6{\nPADDING-LEFT:0.50em\n}\n\n\n\n\n\n\n\nCanada NewsWire\nVANCOUVER, July 25, 2018\n\n\n\nVANCOUVER, July 25, 2018 /CNW/ - IsoEnergy Ltd. (\"IsoEnergy\" or the \"Company\") (TSXV: ISO; OTCQX: ISENF) is pleased to announce that it has intersected an interval of uranium mineralization in drill hole LE18-01A, the final drill hole of its eight-hole summer core drilling program.  \n\nDrill hole LE18-01A was completed on the 100% owned Larocque East property (the \"Property\") in the Eastern Athabasca basin, Saskatchewan (Figure 1).  The drill hole intersected a broad, 8.5-metre-long interval of elevated radioactivity (>500 counts per second (cps) on a hand-held SRAT SPP2 scintillometer (the \"SPP2\")).  The broad interval includes a 2.5-metr...