Business

IsoEnergy Begins Summer Uranium Drilling Program at the Geiger Property

IsoEnergy Begins Summer Uranium Drilling Program at the Geiger Property Canada New...

articleIsoenergy Ltd.June 28, 20183/company/isoenergy-ltd/news/isoenergy-begins-summer-uranium-drilling-program-at-the-geiger-property
IsoEnergy Begins Summer Uranium Drilling Program at the Geiger Property

About this update from Isoenergy Ltd.

[{"type":"text","content":"\n\n\n\nIsoEnergy Begins Summer Uranium Drilling Program at the Geiger Property\n\n/* Style Definitions */\nspan.prnews_span\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\na.prnews_a\n{\ncolor:blue;\n}\nli.prnews_li\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\np.prnews_p\n{\nfont-size:0.62em;\nfont-family:\"Arial\";\ncolor:black;\nmargin:0in;\n}\n\n\n\n\n\n\n\nCanada NewsWire\nVANCOUVER, June 28, 2018\n\n\n\nVANCOUVER, June 28, 2018 /CNW/ - IsoEnergy Ltd. (\"IsoEnergy\" or the \"Company\") (TSXV: ISO; OTCQX: ISENF) is pleased to announce that it has begun a program of follow-up core drilling targeting uranium mineralization at its 100% owned Geiger property (the \"Property\") in the Eastern Athabasca Basin of Saskatchewan.\n\nThe Property\n\nThe Geiger property is located 13 kilometres northwest of IsoEnergy's Radio property near several uranium deposits, mines and mills.  The Roughrider and Midwest deposits are both within 20 kilometres of the Property, as is Orano's McClean Lake uranium mine and mill.  \n\nGeiger is adjacent to the Wollaston-Mudjatik transition zone, a major crustal-scale structural zone related to most of the major uranium deposits in the eastern Athabasca Basin.  Sandstone cover at the Property is thin and ranges between 101 metres and 358 metres.  High grade basement hosted uranium mineralization is present on the Property and it is the primary focus of IsoEnergy's exploration efforts.  Historic drill hole HL-50 intersected 2.74% U3O8 over 1.2 metres in the basement on the H11 South conductor.  Follow-up drilling completed by IsoEnergy in February of this year encountered a thick zone of weak uranium mineralization at the sub-Athabasca unconformity in drill hole GG18-09, 50 metres along strike to the southwest of drill hole HL‑50.  This intersection contained 0.03% U3O8, 2,600 ppm Cu, 998 ppm Ni, 943 ppm Zn and 2.4 g/t Ag over 15.0 metres (207.0-222.0 metres).  The long interval includes individual samples with up to 14,700 ppm Cu, 3,130 ppm Ni, 407 ppm Co, 3,670 ppm Zn and 6.4 g/t Ag.,   \n\nAdditionally, historic drill hole HL-76 was completed 1.6 kilometres along strike to the northeast along the same conductor as HL-50 and intersected 0.65% U3O8 over 0.1 metres.  Mineralization in HL-76 is located ...

More updates from Isoenergy Ltd.