Oorspronkelijke tekst
Deze vertaling beoordelen
Je feedback wordt gebruikt om Google Translate te verbeteren
Home
Ironveld Plc
Post-Blast Imagery and DMS Plant Visuals Released
Published Jun 6 2025
4 min read

Post-Blast Imagery and DMS Plant Visuals Released

6 June 2025

Ironveld PLC

Post-Blast Imagery and DMS Plant Visuals Released

Ironveld PLC ("Ironveld" or the "Company"), the mining development company focused on producing high-value strategic metals, is pleased to announce that, further to this morning's announcement regarding the successful first blast at the planned opencast pit at Altona by Lapon Mining, the Company has released the following images.

The photographs include pre- and post-blast visuals from the Altona site, clearly showing the establishment of the exposed ore zones. Additional images show the  Joint Venture processing plant, which will produce Dense Media Separation (DMS) grade magnetite, located approximately two kilometres from the Lapon mining site.

These visuals provide shareholders with insight into the ongoing operational progress and infrastructure readiness as Ironveld advances towards steady-state ore production and processing.

Please see the images below.

 

A group of people in a field AI-generated content may be incorrect.A group of people standing in a dirt field AI-generated content may be incorrect.

Figure 1 and 2: Images of the opencast pit at Altona, while connecting the ignition system before the blast occurred

 

A dirt field with trees and blue sky AI-generated content may be incorrect.

A large open field with dirt and trees AI-generated content may be incorrect.

Figure 3 and 4: Images, from a distance, of the blast that occurred at the opencast pit


A dirt field with a blue sky AI-generated content may be incorrect.

 Figure 5: The opencast pit following the blast, showing unweathered magnetite ore

 

Figure 6: Kris Andersson, CEO, and Dr. Peter Cox, Technical Director at the Altona site, following the successful blast operation.


A group of men wearing hard hats AI-generated content may be incorrect.A group of people walking in a construction site AI-generated content may be incorrect.A group of people standing around a machine AI-generated content may be incorrect.

Figure 7, 8 and 9: Images of the JV processing plant, which will produce DMS grade magnetite, located approximately two kilometres from the Altona mining site

 

 

For further information, please contact:

 

Ironveld plc

Kristoffer Andersson, Chief Executive Officer


c/o BlytheRay

+44 20 7138 3204

 

Cavendish Capital Markets Limited (Nomad and Broker)

Derrick Lee / Adam Rae


+44 20 7220 0500

Turner Pope Investments (TPI) Ltd (Joint Broker)

Andrew Thacker / James Pope


+44 20 3657 0050

BlytheRay

Tim Blythe / Megan Ray


+44 20 7138 3204