Business
IperionX Commences Titan Critical Minerals Project Definitive Feasibility Study With U.S. Government Support
CHARLOTTE, N.C., April 08, 2025--IperionX Commences Titan Critical Minerals Project Definitive Feasibility Study With U.S. Government Support
About this update from Iperionx Ltd.
[{"type":"image","alt":"","displaySize":"","headline":null,"caption":"","credit":null,"className":"","disableSlideshowImg":false,"size":{"original":{"width":1024,"height":512,"url":"https://media.zenfs.com/en/business-wire.com/129f1098c7b761666cb43ea4c6f5c16e"},"resized":{"url":"https://s.yimg.com/ny/api/res/1.2/34ur2f37OWL4HYXd7dR_VA--/YXBwaWQ9aGlnaGxhbmRlcjt3PTk2MDtoPTQ4MDtjZj13ZWJw/https://media.zenfs.com/en/business-wire.com/129f1098c7b761666cb43ea4c6f5c16e","width":960,"height":480},"lightbox":{"url":"https://s.yimg.com/ny/api/res/1.2/o6IAE6ihCAxa4DZy_XeHlA--/YXBwaWQ9aGlnaGxhbmRlcjt3PTIwNDg7aD0xMDI0O2NmPXdlYnA-/https://media.zenfs.com/en/business-wire.com/129f1098c7b761666cb43ea4c6f5c16e","width":1024,"height":512}},"lazy":false},{"type":"list","items":[{"val":[{"type":"text","content":"Definitive Feasibility Study (DFS) is underway at the Titan Critical Minerals Project in Tennessee – the largest U.S. mineral resource of titanium, zircon and rare earth mineral sands","length":183,"tagName":"p","attribs":{}}]},{"val":[{"type":"text","content":"The DFS is a major step toward developing a fully integrated, mineral-to-metal U.S. titanium supply chain","length":105,"tagName":"p","attribs":{}}]},{"val":[{"type":"text","content":"The DFS is part-funded through IperionX’s U.S. Government award to re-shore a ‘mineral-to-metal' U.S. titanium supply chain. U.S. Government funding awarded to IperionX since January 2023 now totals over US$60 million.","length":222,"tagName":"p","attribs":{}}]},{"val":[{"type":"text","content":"The Titan Project also has the potential to become the largest domestic source of critical heavy rare earth elements – dysprosium and terbium — essential for advanced technologies and national defense","length":200,"tagName":"p","attribs":{}}]},{"val":[{"type":"text","content":"IperionX’s Virginia Titanium Production Facility remains on track for successful ramp-up through 2025","length":101,"tagName":"p","attribs":{}}]}],"tagName":"ul","bulletedList":true,"length":811,"olType":false},{"type":"text","content":"CHARLOTTE, N.C., April 08, 2025--(BUSINESS WIRE)--IperionX Limited (IperionX) (NASDAQ: IPX, ASX: IPX) is pleased to announce the commencement of a Definitive Feasibility Study for its Titan Critical Minerals Project in Tennessee – the largest mineral resource (reported in accordance with the JORC Code) of titanium, rare earth, an...