Business

InZinc Announces Phase 2 Drill Program to Explore for Further Extensions of 700 m Trend of Near Surface Mineralization at Indy Sedex Project, Central BC

Vancouver, British Columbia--(Newsfile Corp. - September 9, 2025) - InZinc Mining Ltd. (TSXV: IZ...

articleInzinc Mining Ltd.September 9, 20253/company/inzinc-mining-ltd/news/inzinc-announces-phase-2-drill-program-to-explore-for-further-extensions-of-700-m-trend-of-near-surface-mineralization-at-indy-sedex-project-central-bc
InZinc Announces Phase 2 Drill Program to Explore for Further Extensions of 700 m Trend of Near Surface Mineralization at Indy Sedex Project, Central BC

About this update from Inzinc Mining Ltd.

[{"type":"text","content":"InZinc Announces Phase 2 Drill Program to Explore for Further Extensions of 700 m Trend of Near Surface Mineralization at Indy Sedex Project, Central BCVancouver, British Columbia--(Newsfile Corp. - September 9, 2025) - InZinc Mining Ltd. (TSXV: IZN) (\"InZinc\" or the \"Company\") is pleased to announce a Phase 2 2025 diamond drill program will commence in September at its 100% owned Indy Sedex (zinc-lead-silver-barite) project, well-located 90 km southeast of Prince George in central British Columbia, Canada. Drilling will follow up on a successful Phase 1 program (11 holes, 1089 m) that extended the B-9 mineralized trend by over 40% to 700 m in length. The B-9 trend remains open for further exploration along trend and at depth. Untested soil geochemical and EM geophysical anomalies continue for at least 750 m to the north of the B-9 trend. Drilling to-date has tested just 10% of the prospective 7.5 km Main Trend (Figure 1). Phase 2 DrillingDrilling is planned to recommence on or around September 11th. An additional 7 to 10 planned drillholes will explore for the northern and southern extensions of the B-9 trend. Highlights of Phase 1 Drilling ResultsIn Phase 1, shallow drilling extended the near surface B-9 mineralized trend from 450 m to greater than 700 m in length. All 2025 drill holes across the B-9 trend reported mineralization at the principle mineralized horizon with nine holes returning mineralization above grade/width cut-off criteria (>1% Zn over 2 m). All intersections defining B-9 mineralization, including drilling prior to 2025, occur within 120 m of surface.Near surface massive sulphides averaging 11.0% Zn, 2.3% Pb and 27.1 g/t Ag over 3.0 m from 61.0 m downhole were intersected in Hole IB25-029 (news release August 18, 2025). Gallium, a critical mineral, was also identified in a massive sulphide sample from Hole IB25-029. The widest intersection to date averaging 3.3% Zn, 0.7% Pb and 7.4 g/t Ag over 19.1 m from 29.9 m downhole, including a high-grade zone averaging 8.5% Zn, 2.1% Pb and 21.3 g/t Ag over 2.0 m from 31.0 m downhole, was intersected in Hole IB25-032 (news release August 21, 2025). The intersection is located 30 m up-dip (west) of the 2018 massive sulphide discovery (IB18-009, news release November 13, 2018) averaging 8.0% Zn, 2.0% Pb, and 16.2 g/t Ag over 9.9 m from 78.1 m downhole.The continuit...

More updates from Inzinc Mining Ltd.