Business
Inventus Mining Expands Shallow Gold Mineralization and Advances Bulk Sampling at The Pardo River of Gold Project
TORONTO, ON / ACCESS Newswire / May 27, 2026 / Inventus Mining Corp. (TSXV:IVS) ("Inventus" or the "Company") is pleased to report additional assay results

About this update from Inventus Mining Corp.
[{"type":"text","content":"\n \nTORONTO, ON / ACCESS Newswire / May 27, 2026 / Inventus Mining Corp. (TSXV:IVS) (\"Inventus\" or the \"Company\") is pleased to report additional assay results from its ongoing Phase 2 drill program and provide an update on its bulk sampling program at the 100%-owned Pardo \"River of Gold\" Project, located 65 km northeast of Sudbury, Ontario.\nHIGHLIGHTS\n\n\n\nProcessing of the remaining 7,500-tonne Trench 1 bulk sample is currently underway with results expected in June.\n\n\n\n\n\n\nPhase 2 drilling restarted on May 21, with seven holes completed to date as part of the Company's planned 7,000-metre drill program designed to expand shallow, flat-lying gold mineralization at Pardo. A second drill rig is planned for mid-June to accelerate drilling ahead of the planned maiden resource estimate in Q4 2026.\n\n\n\n\n\n\nGrade-control drilling west of the Trench 1 bulk sample site confirmed the flat-lying Main Layer within 12 metres of surface and returned highlight intersections of:\n\n\n14.10 g/t gold over 1.59 m, including 47.87 g/t gold over 0.46 m (TR1-26-145)\n\n\n7.58 g/t gold over 2.35 m, including 34.28 g/t gold over 0.40 m (TR1-26-140)\n\n\n3.54 g/t gold over 2.35 m, including 10.81 g/t gold over 0.50 m (TR1-26-141)\n\n\n2.85 g/t gold over 2.36 m, including 7.49 g/t gold over 0.84 m (TR1-26-144)\n\n\n3.80 g/t gold over 1.62 m, including 12.77 g/t gold over 0.40 m (TR1-26-162)\n\n\n4.81 g/t gold over 1.25 m, including 13.95 g/t gold over 0.40 m (TR1-26-160)\n\n\n\n\n\n\n\n\nPhase 2 drilling of the Main Layer returned highlight intersections of:\n\n\n5.14 g/t gold over 2.33 m, including 15.99 g/t gold over 0.70 m (TR2-26-04)\n\n\n3.46 g/t gold over 1.22 m, including 12.24 g/t gold over 0.30 m (PD-26-263)\n\n\n1.06 g/t gold over 3.00 m, including 2.75 g/t gold over 0.50 m (PD-26-246)\n\n\n0.39 g/t gold over 10.50 m, including 1.20 g/t gold over 1.50 m (PD-26-249)\n\n\n0.33 g/t gold over 12.32 m, including 1.14 g/t gold over 2.00 m (PD-26-247)\n\n\n1.59 g/t gold over 1.50 m, including 2.29 g/t gold over 0.50 m (PD-26-235)\n\n\n1.41 g/t gold over 1.93 m, including 5.82 g/t gold over 0.28 m (PD-26-265)\n\n\n1.60 g/t gold over 1.50 m, including 3.35 g/t gold over 0.50 m (TR2-26-02)\n\n\n\n\n\n\n\nPhase 2 drilling of the Matinenda Layer returned highlight intersections of:\n\n\n0.65 g/t gold over 6.53 m, including 1.10g/t go...