Business

International Lithium Provides Update on Exploration Strategy For Mavis Lithium Project, Ontario, Canada

Vancouver, British Columbia--(Newsfile Corp. - October 17, 2017) - International Lithium Corp....

articleIlc Critical Minerals LimitedOctober 17, 20173/company/international-lithium-corp/news/international-lithium-provides-update-on-exploration-strategy-for-mavis-lithium-project-ontario-canada
International Lithium Provides Update on Exploration Strategy For Mavis Lithium Project, Ontario, Canada

About this update from Ilc Critical Minerals Limited

[{"type":"text","content":"International Lithium Provides Update on Exploration Strategy For Mavis Lithium Project, Ontario, CanadaVancouver, British Columbia--(Newsfile Corp. - October 17, 2017) - International Lithium Corp. (TSXV: ILC) (the \"Company\" or \"ILC\") is pleased to announce, with strategic partner Pioneer Resources Limited (\"Pioneer\"), and further to the Company's news release of April 11, 2017, an update on the Mavis Lake Lithium Project in Ontario, Canada. Drilling at the Mavis Lake Lithium Project (\"Mavis\") conducted in February 2017 under the direction of Pioneer (the Company's strategic partner) resulted in several key intersections at the Pegmatite 6 Target Area (Fig. 1). Key Intersections from the Pegmatite 6 Target Area*:1.47% lithium oxide (\"Li2O\") over 17.90 metres* from 80.00 metres in drill hole MF17-39;1.70% Li2O over 26.30 metres from 111.9m in drill hole MF17-49, including a zone grading 2.97% Li2O over 7.70m; and1.45% Li2O over 16.55 metres from 74.55 metres and 1.40% Li2O over 23.10 metres from 122.00 metres in drill hole MF17-50.* All widths reported are drill core widths and have not been converted into true width.Pegmatite 6 Target AreaAs previously reported, four holes were drilled during the campaign to follow up on mineralization encountered in previous drill holes MF-11-12 and MF-12-24 (see Company news releases dated January 12, 2012 and February 19, 2013). Each of the new drill holes intersected spodumene-bearing pegmatites of varied thickness (Table 1).Drill holes MF17-49 and MF17-50 intersected zones of mineralized pegmatite at deeper depths than previously encountered and represent a new discovery at the Mavis Project. Hole MF17-49 returned 1.70% Li2O over 26.30 metres from 111.9 metres, including 2.97% Li2O over 7.70 metres with one sample grading 4.20% Li2O over 1.15 metres.To date, the drilling in the Pegmatite 6 target area has drill tested a horizontal strike length of 60 metres and down dip to a maximum depth of 145 metres below surface.Figure 1: Generalized location of the 2017 drill holes relative to known pegmatite occurrences at the Mavis lithium project.To view an enhanced version of Figure 1, please visit: [http://orders.newsfilecorp.com/files/3232/29744_a1508258895333_50.jpg]Table 1: Selected assay results from the Pegmatite 6 Target Area.PEG006 Target AreaHoleFrom:(m)To:(m)*Width(m) Li2O(Wt%)...

More updates from Ilc Critical Minerals Limited