Business

Integra Resources Intersects 2.26 G/T AuEq Over 102 M at Sullivan Gulch, Including 1.30 G/T Au and 2,718 G/T Ag (36.28 G/T AuEq) Over 1.53 M

Drill results from Sullivan Gulch (located on the eastern portion of the DeLamar Deposit) and Sommercamp-Regan at DeLamar include: IDM-22-204 – Sullivan Gulch 0

articleIntegra Resources CorpJuly 21, 20225/company/integra-resources/news/integra-resources-intersects-226-gt-aueq-over-102-m-at-sullivan-gulch-including-130-gt-au-and-2718-gt-ag-3628-gt-aueq-over-153-m
Integra Resources Intersects 2.26 G/T AuEq Over 102 M at Sullivan Gulch, Including 1.30 G/T Au and 2,718 G/T Ag (36.28 G/T AuEq) Over 1.53 M

About this update from Integra Resources Corp

[{"type":"text","content":" Drill results from Sullivan Gulch (located on the eastern portion of the DeLamar Deposit) and Sommercamp-Regan at DeLamar include: IDM-22-204 – Sullivan Gulch 0.57 grams per tonne (“g/t”) gold (“Au”) and 131.29 g/t silver (“Ag”) (2.26 g/t gold equivalent (“AuEq”)) over 102.11 meters (“m”) Including 0.78 g/t Au and 875.25 g/t Ag (12.05 g/t AuEq) over 6.09 m Including 1.30 g/t Au and 2,718 g/t Ag (36.28 g/t AuEq) over 1.53 m Including 0.46 g/t Au and 176.01 g/t Ag (2.73 g/t AuEq) over 12.19 m IDM-22-206 (the first 100 m is through historic Backfill) – Sommercamp-Regan (Main DeLamar Pit area) 0.27 g/t Au and 48.42 g/t Ag (0.89 g/t AuEq) over 110.64 m  IDM-22-207 0.18 g/t Au and 24.36 g/t Ag (0.50 g/t AuEq) over 99.06 m These drill holes, which were part of a metallurgical drill program and demonstrate the strong continuity of gold-silver at the Project, also extend the known mineralization at Sullivan Gulch by 30 m. The first 100 m of drill hole IDM-22-206 tested historic backfill and encountered strong AuEq grades that could further complement future heap leach plans, providing additional evidence that these low-grade stockpiles and backfill at DeLamar and Florida Mountain have the potential to increase the Oxide-Mixed resource at the Project. A portion of the high-grade intercepts announced today continue to define the recently discovered high-grade Northwest striking gold-silver zone that underlies the bulk tonnage low-grade resource at Sullivan Gulch, with continuity in the North zone of 350 m and the South zone of 350 m. VANCOUVER, British Columbia, July 21, 2022 (GLOBE NEWSWIRE) -- Integra Resources Corp. (“Integra” or the “Company”) (TSX-V: ITR; NYSE American: ITRG) is pleased to announce drill results from the DeLamar Project (“DeLamar” or the “Project”) located in southwestern Idaho. The drill results announced today include long runs of strong mineralization at DeLamar, including multiple high-grade hits of silver. Drill hole IDM-22-207 extended mineralization below the Pre-feasibility Study (“PFS”) Pit Constrained Resource by 30 m and drill hole IDM-22-206 demonstrated the potential for resource in the historic stockpiles and backfill at the Project. “Integra is still very active on the ground and continues to execute on our stated objective of showing resource growth potential on a myriad of exploration fronts at ...

More updates from Integra Resources Corp