Business

Integra Resources Intersects 1.51 g/t AuEq Over 160.33 m, 1.50 g/t AuEq Over 115.52 m and 12.85 g/t AuEq Over 5.19 m at Sullivan Gulch

Drill results from Sullivan Gulch located at the DeLamar Deposit include: IDM-21-201 0.66 grams per tonne (“g/t”) gold (“Au”) and 65.92 g/t silver (“Ag”) (1.51

articleIntegra Resources CorpOctober 21, 20214/company/integra-resources/news/integra-resources-intersects-151-gt-aueq-over-16033-m-150-gt-aueq-over-11552-m-and-1285-gt-aueq-over-519-m-at-sullivan-gulch
Integra Resources Intersects 1.51 g/t AuEq Over 160.33 m, 1.50 g/t AuEq Over 115.52 m and 12.85 g/t AuEq Over 5.19 m at Sullivan Gulch

About this update from Integra Resources Corp

[{"type":"text","content":" Drill results from Sullivan Gulch located at the DeLamar Deposit include:  IDM-21-201 0.66 grams per tonne (“g/t”) gold (“Au”) and 65.92 g/t silver (“Ag”) (1.51 g/t gold equivalent (“AuEq”)) over 160.33 meters (“m”) Including 1.32 g/t Au and 286.00 g/t Ag (5.00 g/t AuEq) over 1.52 m Including 2.20 g/t Au and 217.00 g/t Ag (4.99 g/t AuEq) over 3.04 m Including 0.55 g/t Au and 342.00 g/t Ag (4.95 g/t AuEq) over 1.98 m Including 5.11 g/t Au and 63.25 g/t Ag (5.92 g/t AuEq) over 1.53 m IDM-21-202 0.55 g/t Au and 34.51 Ag (1.00 g/t AuEq) over 124.06 m Including 1.59 g/t Au and 466.00 g/t Ag (7.59 g/t AuEq) over 1.53 m Including 0.29 g/t Au and 444.00 g/t Ag (6.01 g/t AuEq) over 1.52 m IDM-21-203 12.04 g/t Au and 63.02 g/t Ag (12.85 g/t AuEq) over 5.19 m 0.66 g/t Au and 65.51 g/t Ag (1.50 g/t AuEq) over 115.52 m Including 0.27 g/t Au and 606.00 g/t Ag (8.07 g/t AuEq) over 1.52 m Including 1.74 g/t Au and 606.00 g/t Ag (9.54 g/t AuEq) over 1.53 m Including 4.55 g/t Au and 339.87 g/t Ag (8.93 g/t AuEq) over 4.57 m Including 6.65 g/t Au and 11.38 g/t Ag (6.80 g/t AuEq) over 1.52 m  These drill results were completed as part of a metallurgical drill program designed to further optimize unoxidized material from Sullivan Gulch for future studies. Drilling to date at Sullivan Gulch has delineated mineralization extending over a strike length of 1,000 m with a width of 200 m and a depth of 350 m. The PFS remains scheduled for completion in Q4 2021. To view a video of President and CEO George Salamis discussing the drill results, click on the following link: https://www.youtube.com/watch?v=6ptJtUQCSUY Sullivan Gulch Met Drill Results - YouTubeTap to unmuteSullivan Gulch Met Drill ResultsIntegra Resources Corp.Integra Resources Corp.336 subscribersWatch on VANCOUVER, British Columbia, Oct. 21, 2021 (GLOBE NEWSWIRE) -- Integra Resources Corp. (“Integra” or the “Company”) (TSX-V: ITR; NYSE American: ITRG) is pleased to announce drill results from an ongoing metallurgical drill program at the DeLamar Project (“DeLamar” or the “Project”). The drill results announced today are from Sullivan Gulch, a target east-southeast of the DeLamar Deposit. Metallurgical drilling at Sullivan Gulch has been designed to further optimize and potentially include additional mineralized material from Sullivan Gulch in future studies. “Sullivan Gulch continu...

More updates from Integra Resources Corp