Business

Indonesia Energy Plans to Commence Drilling Two Wells at Kruh Block During the Remainder of 2025

Drilling part of company’s continuing plans to drill a total of 18 wells at the 63,000 acre Kruh Block JAKARTA, INDONESIA AND DANVILLE, CA, July 23, 2025 (GLOBE NEWSWIRE) -- Indonesia Energy Corporation (NYSE American: INDO) ("IEC"), an oil and gas exploration and production company focused on Indonesia, today announced that it plans to drill two (2) back-to-back wells on IEC’s 63,000 acre Kruh Block commencing in the fourth quarter of 2025. The new drilling activities will be supported by the p

articleIndonesia Energy Corporation LimitedJuly 23, 20255/company/indonesia-energy-corporation-limited/news/indonesia-energy-plans-to-commence-drilling-two-wells-at-kruh-block-during-the-remainder-of-2025
Indonesia Energy Plans to Commence Drilling Two Wells at Kruh Block During the Remainder of 2025

About this update from Indonesia Energy Corporation Limited

[{"type":"image","alt":"Indonesia Energy Corporation Limited","displaySize":"","headline":null,"caption":"Indonesia Energy Corporation Limited","className":"","disableSlideshowImg":false,"size":{"original":{"width":300,"height":115,"url":"https://media.zenfs.com/en/globenewswire.com/c3bb43e87e71b16b804ddeb4045797c0"},"resized":{"url":"https://s.yimg.com/ny/api/res/1.2/OCWDqXKMzbQCx9mRDJlQyQ--/YXBwaWQ9aGlnaGxhbmRlcjt3PTQyMDtoPTE2MTtjZj13ZWJw/https://media.zenfs.com/en/globenewswire.com/c3bb43e87e71b16b804ddeb4045797c0","width":300,"height":115}},"lazy":false},{"type":"text","content":"Drilling part of company’s continuing plans to drill a total of 18 wells at the 63,000 acre Kruh Block","length":108,"tagName":"p"},{"type":"text","content":"JAKARTA, INDONESIA AND DANVILLE, CA, July 23, 2025 (GLOBE NEWSWIRE) -- Indonesia Energy Corporation (NYSE American: INDO) ("IEC"), an oil and gas exploration and production company focused on Indonesia, today announced that it plans to drill two (2) back-to-back wells on IEC’s 63,000 acre Kruh Block commencing in the fourth quarter of 2025.","length":352,"tagName":"p"},{"type":"text","content":"The new drilling activities will be supported by the previously announced exploratory seismic work which was undertaken by IEC during 2024 and early 2025 that upgraded IEC’s wellsite prospects and drilling locations with a view towards maximizing production.","length":258,"tagName":"p"},{"type":"text","content":"IEC’s planned drilling activities are expected to encompass:","length":60,"tagName":"p"},{"type":"list","items":[{"val":[{"type":"text","content":"Two wells being drilled back-to-back to help minimize mobilization costs.","length":73,"tagName":"p","attribs":{}}]},{"val":[{"type":"text","content":"A 750 horsepower drilling rig is planned to be used and is currently undergoing final inspection.","length":97,"tagName":"p","attribs":{}}]},{"val":[{"type":"text","content":"The wells will be designated “Kruh-29” (Kruh Field, planned total depth: 3,400 ft) and “West Kruh-5” (West Kruh Field, planned total depth: 5,200 ft), representing IEC’s first new well drilling activity in West Kruh Field.","length":222,"tagName":"p","attribs":{}}]},{"val":[{"type":"text","content":"Surface locations and subsurface geology for both wells have been approved by SKK Migas and Pertamina, the applicable Indonesian government entitie...

More updates from Indonesia Energy Corporation Limited

Kruh BlockIndonesiadrilling activitiesJAKARTA, INDONESIAWest Kruh FieldCitarum Blockdrilling