Business

Imperial Reports Production for 2025 Third Quarter at Red Chris Mine

VANCOUVER, British Columbia, Oct. 23, 2025 (GLOBE NEWSWIRE) -- Imperial Metals Corporation (&...

articleImperial Metals CorporationOctober 23, 20254/company/imperial-metals-corporation/news/imperial-reports-production-for-2025-third-quarter-at-red-chris-mine
Imperial Reports Production for 2025 Third Quarter at Red Chris Mine

About this update from Imperial Metals Corporation

[{"type":"text","content":"Imperial Reports Production for 2025 Third Quarter at Red Chris Mine\n\n\n\n VANCOUVER, British Columbia, Oct. 23, 2025 (GLOBE NEWSWIRE) --\n \n Imperial Metals Corporation\n \n (“Imperial” or the “Company”) (TSX:III) reports quarterly copper and gold production from the 30% owned Red Chris mine in northwest British Columbia. Red Chris production (100%) for the third quarter of 2025 was 20.900 million pounds of copper and 21,660 ounces gold compared to 18.977 million pounds copper and 13,414 ounces gold during the same quarter of 2024. Imperial’s share of Q3 production from Red Chris was 6.270 million pounds copper and 6,498 ounces gold.\n \n\n In the third quarter of 2025, Red Chris mine copper production was up 10% compared to the third quarter of 2024. The increase in copper production was a result of a 17% increase in copper grade (0.589% vs 0.504%), offset by a small decrease in throughput. Gold production in the third quarter of 2025 was up 61% from the third quarter of 2024 as result of the higher gold grades (0.562 g/t vs 0.365 g/t) and recovery, offset by slightly lower throughput.\n \n\n For the first nine months of 2025, copper production was up 20% compared to the same period last year on higher copper grades and gold production was up 86% on higher gold grades and better recovery.\n \n\n\n\n 100% Red Chris mine production\n \n\n Three Months Ended Sept 30\n \n\n\n\n Nine Months Ended Sept 30\n \n\n\n\n\n\n 2025\n \n\n 2024\n \n\n\n\n 2025\n \n\n 2024\n \n\n\n\n Ore milled - tonnes\n \n\n 1,912,757\n \n\n 1,995,442\n \n\n\n\n 6,356,020\n \n\n 6,585,328\n \n\n\n\n Ore milled per calendar day - tonnes\n \n\n 20,791\n \n\n 21,690\n \n\n\n\n 23,197\n \n\n 24,034\n \n\n\n\n Grade % - copper\n \n\n 0.589\n \n\n 0. 504\n \n\n\n\n 0.583\n \n\n 0.466\n \n\n\n\n Grade g/t - gold\n \n\n 0.562\n \n\n 0. 365\n \n\n\n\n 0.529\n \n\n 0.308\n \n\n\n\n Recovery % - copper\n \n\n 84.2\n \n\n 85.6\n \n\n\n\n 82.7\n \n\n 83.2\n \n\n\n\n Recovery % - gold\n \n\n 62.7\n \n\n 57.3\n \n\n\n\n 61.1\n \n\n 54.3\n \n\n\n\n Copper - 000’s pounds\n \n\n 20,900\n \n\n 18,977\n \n\n\n\n 67,506\n \n\n 56,369\n \n\n\n\n Gold - ounces\n \n\n 21,660\n \n\n 13,414\n \n\n\n\n 65,947\n \n\n 35,452\n \n\n\n\n\n Work on the Feasibility Study for the Block Cave mine is advancing with the potential to annou...

More updates from Imperial Metals Corporation