Business
Imperial Provides Update on Mount Polley 2025 Production and Exploration
VANCOUVER, British Columbia, Feb. 10, 2026 (GLOBE NEWSWIRE) -- Imperial Metals Corporation (the “Company” or “Imperial”) (TSX:III) reports that 2025 metal production from Mount Polley mine was 30.715 million pounds of copper and 37,555 ounces of gold. The mine production exceeded the 2025 target of 25.0 – 27.0 million pounds for copper production and met the target of 35 - 40 thousand ounces for gold production. Mount Polley Mine – Production During 2025, 6,714,195 tonnes of ore were treated, wh
About this update from Imperial Metals Corporation
[{"type":"image","alt":"Imperial Metals Corporation","displaySize":"","headline":null,"caption":"Imperial Metals Corporation","className":"","disableSlideshowImg":false,"size":{"original":{"width":300,"height":109,"url":"https://media.zenfs.com/en/globenewswire.com/5e371f6de2c0c1189a15aa4a36e9e576"},"resized":{"url":"https://s.yimg.com/ny/api/res/1.2/rDFAlqSHhYHgSTHDVgTnDA--/YXBwaWQ9aGlnaGxhbmRlcjt3PTQyMDtoPTE1MztjZj13ZWJw/https://media.zenfs.com/en/globenewswire.com/5e371f6de2c0c1189a15aa4a36e9e576","width":300,"height":109}},"lazy":false},{"type":"text","content":"VANCOUVER, British Columbia, Feb. 10, 2026 (GLOBE NEWSWIRE) -- Imperial Metals Corporation (the “Company” or “Imperial”) (TSX:III) reports that 2025 metal production from Mount Polley mine was 30.715 million pounds of copper and 37,555 ounces of gold. The mine production exceeded the 2025 target of 25.0 – 27.0 million pounds for copper production and met the target of 35 - 40 thousand ounces for gold production.","length":415,"tagName":"p"},{"type":"text","content":"Mount Polley Mine – Production","length":30,"tagName":"p"},{"type":"text","content":"During 2025, 6,714,195 tonnes of ore were treated, which was flat compared to 2024, and 30.715 million pounds copper (down 14.0% from 2024) and 37,555 ounces gold (down 4% from 2024) were produced.","length":197,"tagName":"p"},{"type":"text","content":"The majority of the mill feed during the fourth quarter was from Phase 5 and low grade stockpiles. This led to lower grades and lower copper recovery during the period. The Phase 4 and 5 pushbacks of the Springer Pit generated approximately 50% of the mill feed during the quarter with the remainder coming from lower grade stockpiles. Phase 4 mining will be completed in February 2026.","length":386,"tagName":"p"},{"type":"table","headerItems":[],"items":[{"val":[{"style":"max-width:44%;min-width:44%;vertical-align:middle;text-align:left;padding-left:10.0px;vertical-align:bottom;","val":[{"type":"text","content":"Mount Polley Mine Production","length":28,"tagName":"p","attribs":{}}]},{"colspan":"3","style":"max-width:13%;min-width:13%;text-align:right;vertical-align:middle;padding-right:0;vertical-align:bottom;","val":[{"type":"text","content":"Three Months Ended December 31","length":30,"tagName":"p","attribs":{}}]},{"style":"max-width:1%;min-width:1%;text-align:right;vertical-align:middle;padding-rig...