Business

Imperial Metals Reports Red Chris Production and Exploration Update for 2020 First Quarter

VANCOUVER, British Columbia, April 29, 2020 (GLOBE NEWSWIRE) -- Imperial Metals Corporation (the “Company”) (TSX:III) reports Red Chris metal production for the

articleImperial Metals CorporationApril 29, 20204/company/imperial-metals-corporation/news/imperial-metals-reports-red-chris-production-and-exploration-update-for-2020-first-quarter
Imperial Metals Reports Red Chris Production and Exploration Update for 2020 First Quarter

About this update from Imperial Metals Corporation

[{"type":"text","content":" VANCOUVER, British Columbia, April 29, 2020 (GLOBE NEWSWIRE) -- Imperial Metals Corporation (the “Company”) (TSX:III) reports Red Chris metal production for the first quarter of 2020 was 22.5 million pounds copper and 17,427 ounces gold, up from 21.7 million pounds copper and 12,155 ounces gold in the fourth quarter of 2019.  Imperial’s 30% portion of the first quarter production was 6.7 million pounds copper and 5,228 ounces gold. Exploration Update Two drilling programs are underway at Red Chris. The East Zone Resource Definition Programme is designed to obtain geological, geotechnical and metallurgical data to support future studies for underground block cave mining. The Brownfields Exploration Programme is focused on searching for additional zones of higher grade mineralization within the Red Chris porphyry corridor.  A total of 14,641 metres of drilling was completed in the 2020 March quarter, contributing to a total of 29,383 metres of drilling completed since Newcrest acquired its 70% interest in Red Chris on August 15, 2020. A new high grade zone has been intersected by RC616 within the East zone, returning a partial intercept of 238 metres grading 1.5 g/t gold and 0.85% copper, including 104 metres grading 2.7 g/t gold and 1.4% copper, and 32 metres grading 6.2 g/t gold and 3% copper. This high grade zone has not been intersected by previous drilling and is located 300 metres west of the high grade zone previously intersected by RC611. This drilling confirms the potential of finding additional discrete high grade pods of mineralization within the East zone. Follow up drilling to define the extent of the RC616 high grade zone is being planned. The final results from RC611 (partial results reported March 10, 2020) has confirmed that the hole has intersected a broad zone of higher grade mineralization, 628 metres grading 1.7 g/t gold and 0.91% copper that contains a discrete high grade zone averaging more than 5 g/t gold. This zone was previously intersected by Imperial in RC09-350 which returned an interval of 152.5 metres grading 4.12% copper and 8.83 g/t gold starting at a depth of 540 metres. Hole RC611 was the first angled hole intersection which has confirmed this high grade pod as being approximately 100 metres long, 100 metres wide and 200 metres in height. An additional 10 resource definition holes are ...

More updates from Imperial Metals Corporation