Business

IMPACT SILVER RECEIVES FINAL DRILL RESULTS FROM GCC (GOLONDRINAS, CUCHARA, CHONTALPAN) SECTOR, MEXICO

Jun. 7, 2011 (TheNewswire.ca) -- IMPACT Silver Corp. ("IMPACT" or "the Company") is pleased ...

articleImpact Silver Corp.June 7, 20115/company/impact-silver-corp/news/impact-silver-receives-final-drill-results-from-gcc-golondrinas-cuchara-chontalpan-sector-mexico
IMPACT SILVER RECEIVES FINAL DRILL RESULTS FROM GCC (GOLONDRINAS, CUCHARA, CHONTALPAN) SECTOR, MEXICO

About this update from Impact Silver Corp.

[{"type":"text","content":"\nIMPACT SILVER RECEIVES FINAL DRILL RESULTS FROM GCC (GOLONDRINAS, CUCHARA, CHONTALPAN) SECTOR, MEXICO\n\n Jun. 7, 2011 (TheNewswire.ca) -- IMPACT Silver Corp. (\"IMPACT\" or \"the Company\") is pleased to announce drill results from the final holes of the first phase drill program at the Golondrinas Project and the second phase drill program at the Chontalpan Project located three kilometers and five kilometers, respectively, southeast of IMPACT'S 500-tpd (\"tonnes per day\") Guadalupe processing plant in the 423-square-kilometer Zacualpan Silver District in central Mexico. Based on the exploration programs completed in both areas, the Company plans to conduct additional work in each project area, including a preliminary economic evaluation on the Chontalpan project. Below is a summary of the recent work completed.Chontalpan Drilling AreaThe results reported in this press release represent step-out holes at 50 m centers that tested strike and down dip extensions for two drilling areas (Loma Largo and Chontalpan Mine Northwest) located approximately 500 m apart (see press release dated August 3, 2010). Previously announced drill results included 402.6 g/t silver over 2.14 m see (see press release dated September 15, 2010). This second phase of drilling has successfully added potential tonnage to these drilling areas and the data will now be handed over to IMPACT's mine development group for a preliminary economic evaluation.SECOND PHASE DRILL INTERSECTIONS - CHONTALPAN DRILLING AREA\n\n-------------------------------------------------------------------------------------\n|DRILL |VEIN |DRILL |FROM |TO |INTERVAL|TRUE |SILVER|GOLD |LEAD|ZINC|\n| | | | | | |WIDTH| | | | |\n|-----------------------------------------------------------------------------------|\n|HOLE |NAME |SECTION |(m) |(m) |(m) |(m) |(g/t) |(g/t)|(%) |(%) |\n|-----------------------------------------------------------------------------------|\n|  |Loma Largo Sector |  |  |  |  |  |  |\n|-----------------------------------------------------------------------------------|\n|Z10-30|Chontalpan|00+50 N |32.20 |34.10 |1.90 |1.87 |111.3 |0.027|0.11|0.16|\n|-----------------------------------------------------------------------------------|\n|  |  |  |  |  |  |  |  |  |  |  |\n|-------...

More updates from Impact Silver Corp.