Business

IMPACT SILVER ANNOUNCES FIRST RESULTS FROM 5,000M DRILL PROGRAM AT ZACUALPAN SILVER DISTRICT

IMPACT SILVER ANNOUNCES FIRST RESULTS FROM 5,000M DRILL PROGRAM AT ZACUALPAN SILVER DISTRICT

articleImpact Silver Corp.July 27, 20104/company/impact-silver-corp/news/impact-silver-announces-first-results-from-5000m-drill-program-at-zacualpan-silver-district
IMPACT SILVER ANNOUNCES FIRST RESULTS FROM 5,000M DRILL PROGRAM AT ZACUALPAN SILVER DISTRICT

About this update from Impact Silver Corp.

[{"type":"text","content":"\nIMPACT SILVER ANNOUNCES FIRST RESULTS FROM 5,000M DRILL PROGRAM AT ZACUALPAN SILVER DISTRICT\n\n\n Jul. 27, 2010 (TheNewswire.ca) -- IMPACT Silver Corp. (\"IMPACT\") is pleased to announce that drilling has now returned to the heart of the Royal Mines of Zacualpan Silver-Gold District in Mexico to test a number of high priority drill targets associated with old mines in an initial 5,000 meter drill program.Assays have been received from four exploratory holes at the San Ramon Mine and Santa Lucia prospect. The first two holes (Z10-01 and Z10-02) were drilled to test extensions of the San Ramon Mine, located 4.8 kilometers southeast of IMPACT's Guadalupe processing plant. Drill hole Z10-01 was targeted to an area 70m northwest of current mine workings and Z10-02 targeted 140 m below the southeastern limit of the mine workings. Both holes intersected a variety of veins as described in the following table:\nSUMMARY OF SAN RAMON EXTENSIONS DRILL INTERSECTIONS \nDRILL VEIN FROM TO INTERVAL SILVER GOLD LEAD ZINC \nHOLE NAME (m) (m) (m) (g/t) (g/t) (%) (%) \n \nZ10-01 Inmaculada 136.8 137.8 1.0 203.0 0.93 0.25 0.61 \n and \nZ10-01 20th de Noviembre 145.3 146.5 1.2 249.00 1.17 0.20 0.58 \n \nZ10-02 Chaparrita 227.4 229.8 2.4 331.1 0.14 0.31 1.14 \n and \nZ10-02 Chaparrita Splay 241.5 242.7 1.2 226.00 0.05 0.06 0.25 \n and \nZ10-02 Intermediate 275.5 275.9 0.4 560.00 0.08 0.17 0.36 \nThe other two holes (Z10-03 and Z10-04) were drilled at the Santa Lucia prospect, located three kilometers east of IMPACT's Guadalupe processing plant as follow-up to the 2009 Phase One drill program. Highlights from the 2009 drilling included 278g/t Silver across 6.3m (DH Z09-47), 1,905g/t Silver across 0.6m (DH Z09-37) and 419g/t Silver across 2.4m (DH Z09-53), (See IMPACT News Release dated January 20, 2010 for details). Both of the 2010 holes were intended to test the continuity of the southwest dipping Caguilote Vein at depth but instead intersected a previously unrecognized northeast dipping vein set. Further drilling is planned for the Santa Lucia upon the completion of additional structural interpretation work.A summary of the recent drill results from the new veins at Santa Lucia is in the following table:\nSUMMARY OF SANTA LUCIA DRILL INTERSECTIONS \nDRILL FROM TO INTERVAL SILVER GOLD LEAD ZINC \nHOLE (m) (m) (m) (g/t) (g/t) (%) (%) \n SECTION 15...

More updates from Impact Silver Corp.