Business

IAMGOLD Releases High Grade Infill Drill Results at the Diakha-Siribaya Gold Project in Mali

Toronto, Ontario--(Newsfile Corp. - November 30, 2021) - IAMGOLD Corporation (TSX: IMG) (NYS...

articleIamgold CorporationNovember 30, 20215/company/iamgold/news/iamgold-releases-high-grade-infill-drill-results-at-the-diakha-siribaya-gold-project-in-mali
IAMGOLD Releases High Grade Infill Drill Results at the Diakha-Siribaya Gold Project in Mali

About this update from Iamgold Corporation

[{"type":"text","content":"IAMGOLD Releases High Grade Infill Drill Results at the Diakha-Siribaya Gold Project in MaliToronto, Ontario--(Newsfile Corp. - November 30, 2021) - IAMGOLD Corporation (TSX: IMG) (NYSE: IAG) (\"IAMGOLD\" or the \"Company\") is pleased to announce results from its 2021 exploration infill drilling program completed at the Diakha deposit on its wholly owned Diakha-Siribaya Gold project located in western Mali along the borders with Senegal and Guinea. Highlights include:Diamond Drill Holes (refer to Table 1 below)12 meters (\"m\") at 9.32 grams per tonne gold (\"g/t Au\") in drill hole SRD21-284 from 284 m including3 m at 27.15 g/t Au from 284 m13 m at 11.20 g/t Au in drill hole SRD21-303 from 277 m including2 m at 67.98 g/t Au from 279 m10 m at 11.70 g/t Au in drill hole SRD21-305 from 164 m including4 m at 27.63 g/t Au from 169 m17 m at 2.17 g/t Au in drill hole SRD21-300 from 177 m, followed by a separate interval of:20 m at 5.47 g/t Au from 269 m including7 m at 11.74 g/t Au from 282 m20 m at 5.40 g/t Au in drill hole SRD21-308 from 108 m including1 m at 69.34 g/t Au from 114 m13 m at 4.12 g/t Au in drill hole SRD21-307 from 224 m including1 m at 17.40 g/t Au from 225 m and2 m at 13.40 g/t Au from 233 m15 m at 3.91 g/t Au in drill hole SRD21-311 from 242 m including3 m at 13.06 g/t Au from 246 m and1 m at 11.40 g/t Au from 251 mReverse Circulation (\"RC\") Drill Holes (refer to Table 2 below)16 m at 14.00 g/t Au in drill hole SRD21-891 from 89 m including3 m at 41.95 g/t Au from 99 m20 m at 1.97 g/t Au in drill hole SRD21-883 from 43 m, including1 m at 21.89 g/t Au from 48 m, followed by a separate interval of:27 m at 2.12 g/t Au from 75 m including3 m at 6.52 g/t Au from 76 m and 1m at 21.31 g/t Au from 101 m12 m at 4.19 g/t Au in drill hole SRD21-889 from 108 m including2 m at 18.84 g/t Au from 117 m32 m at 1.97 g/t Au in drill hole SRD21-907 from 88 m including1 m at 16.40 g/t Au from 89 m11 m at 4.96 g/t Au in drill hole SRD21-848 from 55 m including1 m at 39.80 g/t Au from 65 m24 m at 2.23 g/t Au in drill hole SRD21-882 from 43 m including2 m at 17.01 g/t Au from 54 mCraig MacDougall, Executive Vice President, Growth for IAMGOLD, stated: \"We are very pleased with the results of our 2021 exploration program, which have helped to demonstrate continuity of mineralization between previously completed drill holes and better d...

More updates from Iamgold Corporation