Business
IAMGOLD Releases High Grade Infill Drill Results at the Diakha-Siribaya Gold Project in Mali
Toronto, Ontario--(Newsfile Corp. - November 30, 2021) - IAMGOLD Corporation (TSX: IMG) (NYS...

About this update from Iamgold Corporation
[{"type":"text","content":"IAMGOLD Releases High Grade Infill Drill Results at the Diakha-Siribaya Gold Project in MaliToronto, Ontario--(Newsfile Corp. - November 30, 2021) - IAMGOLD Corporation (TSX: IMG) (NYSE: IAG) (\"IAMGOLD\" or the \"Company\") is pleased to announce results from its 2021 exploration infill drilling program completed at the Diakha deposit on its wholly owned Diakha-Siribaya Gold project located in western Mali along the borders with Senegal and Guinea. Highlights include:Diamond Drill Holes (refer to Table 1 below)12 meters (\"m\") at 9.32 grams per tonne gold (\"g/t Au\") in drill hole SRD21-284 from 284 m including3 m at 27.15 g/t Au from 284 m13 m at 11.20 g/t Au in drill hole SRD21-303 from 277 m including2 m at 67.98 g/t Au from 279 m10 m at 11.70 g/t Au in drill hole SRD21-305 from 164 m including4 m at 27.63 g/t Au from 169 m17 m at 2.17 g/t Au in drill hole SRD21-300 from 177 m, followed by a separate interval of:20 m at 5.47 g/t Au from 269 m including7 m at 11.74 g/t Au from 282 m20 m at 5.40 g/t Au in drill hole SRD21-308 from 108 m including1 m at 69.34 g/t Au from 114 m13 m at 4.12 g/t Au in drill hole SRD21-307 from 224 m including1 m at 17.40 g/t Au from 225 m and2 m at 13.40 g/t Au from 233 m15 m at 3.91 g/t Au in drill hole SRD21-311 from 242 m including3 m at 13.06 g/t Au from 246 m and1 m at 11.40 g/t Au from 251 mReverse Circulation (\"RC\") Drill Holes (refer to Table 2 below)16 m at 14.00 g/t Au in drill hole SRD21-891 from 89 m including3 m at 41.95 g/t Au from 99 m20 m at 1.97 g/t Au in drill hole SRD21-883 from 43 m, including1 m at 21.89 g/t Au from 48 m, followed by a separate interval of:27 m at 2.12 g/t Au from 75 m including3 m at 6.52 g/t Au from 76 m and 1m at 21.31 g/t Au from 101 m12 m at 4.19 g/t Au in drill hole SRD21-889 from 108 m including2 m at 18.84 g/t Au from 117 m32 m at 1.97 g/t Au in drill hole SRD21-907 from 88 m including1 m at 16.40 g/t Au from 89 m11 m at 4.96 g/t Au in drill hole SRD21-848 from 55 m including1 m at 39.80 g/t Au from 65 m24 m at 2.23 g/t Au in drill hole SRD21-882 from 43 m including2 m at 17.01 g/t Au from 54 mCraig MacDougall, Executive Vice President, Growth for IAMGOLD, stated: \"We are very pleased with the results of our 2021 exploration program, which have helped to demonstrate continuity of mineralization between previously completed drill holes and better d...