Business

Highland Copper Announces Completion of Copperwood Metallurgical Drilling and Continued Progress on Detailed Engineering

VANCOUVER, British Columbia, May 14, 2025 (GLOBE NEWSWIRE) -- Highland Copper Company Inc. (TSXV: HI; OTCQB: HDRSF) (“Highland” or the “Company”) is pleased to provide an update on recent developments at its 100%-owned Copperwood Project (“Copperwood”) and the White Pine North Project (“White Pine”), a joint venture with Kinterra Copper USA LLC (“Kinterra”). Highland continues to advance Copperwood toward a near-term construction decision through a phased approach to detailed engineering which i

articleHighland Copper Co., Inc.May 14, 20257/company/highland-copper/news/highland-copper-announces-completion-copperwood-113000856
Highland Copper Announces Completion of Copperwood Metallurgical Drilling and Continued Progress on Detailed Engineering

About this update from Highland Copper Co., Inc.

[{"type":"image","alt":"Highland Copper Company Inc.","displaySize":"","headline":null,"caption":"Highland Copper Company Inc.","className":"","disableSlideshowImg":false,"size":{"original":{"width":300,"height":300,"url":"https://media.zenfs.com/en/globenewswire.com/4262ccc730a393c1b6cc5e767c19b43c"},"resized":{"url":"https://s.yimg.com/ny/api/res/1.2/L8B5QcPMcKj96fM02V.Gyg--/YXBwaWQ9aGlnaGxhbmRlcjt3PTQyMDtoPTQyMDtjZj13ZWJw/https://media.zenfs.com/en/globenewswire.com/4262ccc730a393c1b6cc5e767c19b43c","width":300,"height":300}},"lazy":false},{"type":"text","content":"VANCOUVER, British Columbia, May 14, 2025 (GLOBE NEWSWIRE) -- Highland Copper Company Inc. (TSXV: HI; OTCQB: HDRSF) (“Highland” or the “Company”) is pleased to provide an update on recent developments at its 100%-owned Copperwood Project (“Copperwood”) and the White Pine North Project (“White Pine”), a joint venture with Kinterra Copper USA LLC (“Kinterra”).","length":360,"tagName":"p"},{"type":"text","content":"Highland continues to advance Copperwood toward a near-term construction decision through a phased approach to detailed engineering which is designed to optimize and de-risk the project. Particularly, the metallurgical drill program was successfully completed with samples now being tested. At White Pine, Kinterra has made steady progress on environmental baselining and engineering. Both projects remain wellsequenced and highly leveraged to the copper price, offering a strong copper production profile in the supportive jurisdiction of Michigan’s Upper Peninsula.","length":567,"tagName":"p"},{"type":"text","content":"Copperwood 2025 Program and Catalysts","length":37,"tagName":"p"},{"type":"text","content":"2025 Site Work: During 2025, the Company will complete its remaining obligations related to its Wetlands and Streams Permit. This includes landscaping and tree planting on its newly created wetlands, in addition to an off-site stream mitigation project. The work continues to build Highland’s operating presence, demonstrates strong environmental stewardship and strengthens relationships with local authorities and stakeholders. The 2025 work program is the final site work required in advance of a construction decision. This implies a lower site expenditure rate following the completion of this work until a full construction decision is made.","length":647,"tagName":"p","attribs":{}},{...

More updates from Highland Copper Co., Inc.

Copperwood ProjectKinterra Copper USA LLCHighlandWhite PineCopperwoodconstruction decisionMichiganHighland Copperdetailed engineeringHighland Copper Company