Business
Harfang Exploration Inc. continues to deliver high grade gold on the Serpent Project (James Bay, Québec)
MONTREAL, Sept. 28, 2021 (GLOBE NEWSWIRE) -- Harfang Exploration Inc. (“Harfang”) (TSX-V: HAR) is pleased to report high grade gold results from bedrock samples

About this update from Harfang Exploration, Inc.
[{"type":"text","content":" MONTREAL, Sept. 28, 2021 (GLOBE NEWSWIRE) -- Harfang Exploration Inc. (“Harfang”) (TSX-V: HAR) is pleased to report high grade gold results from bedrock samples from its summer exploration program on its wholly owned Serpent Property (“Property”) located in Eeyou Istchee – James Bay (Québec) (Fig. 1). A current 3,500 m drill program is well underway to test significant gold trends on the Property. Highlights include: Grab samples up to 345 g/t Au from Trench TR-21-26; Channel samples up to 208 g/t Au over 0.75 m (Powerline showing); Quartz-tourmaline boulders (up to 45.5 g/t Au) up-ice of the Moby-Dick gold structure; Metallic sieve analyses up to 3,710 g/t Au for the coarse fraction (>106 microns) confirming the abundance of coarse-grained gold grains. These results demonstrate the potential for high grade orogenic gold mineralizations along structures more than 7 km long straddling Harfang and LaSalle’s properties (Fig. 2). Regional prospecting outlines potential for additional gold structures north and south of the Stu structure. Harfang carries with confidence its drill program in and around the marshland up-ice of the gold-in-till anomaly. Table 1. Most significant gold samples (>5 g/t Au) from the summer 2021 program (preliminary results). Area Au (g/t) Length (m) Metallic Sieve Powerline Channel 208 0.75 3,710 g/t Au for the coarse fraction Channel 86.92 0.90 Results pending Channel 46.3 0.30 731 g/t Au for the coarse fraction Channel 18.90 1.05 Results pending Grab 296 Results pending Grab 32.9 Results pending Grab 15.7 Results pending TR-21-26 Grab 345 Results pending Channel 27.10 0.60 699 g/t Au for the coarse fraction Channel 10.65 0.40 109.5 g/t Au for the coarse fraction Channel 6.77 0.52 103.5 g/t Au for the coarse fraction Quartz-tourmaline Boulders Grab 45.5 Results pending Grab 13.25 Results pending Grab 5.85 Trench TR-21-24 Channel 13.30 0.65 196 g/t Au for the coarse fraction Channel 10.30 0.30 Results pending Trench TR-21-25 Channel 17.58 0.95 Results pending TR-21-03 Channel 26.3 0.25 Results pending Channel 13.8 0.35 Results pending Channel 8.17 0.25 TR-21-07 ...