Business
Nickel One Announces Initial Drill Results from the Tyko Project, including 1.04% Nickel over 16.19m
Nickel One Announces Initial Drill Results from the Tyko Project, including 1.04%...

About this update from Gt Resources Inc
[{"type":"text","content":"Nickel One Announces Initial Drill Results from the Tyko Project, including 1.04% Nickel over 16.19m \n\t\t\tbody { font-size: 11pt;\n\t\t\t}\n\n\t\t\t.nr-sub-head ul,\n\t\t\t.nr-body ul {\n\t\t\t\tlist-style-type: disc !important;\n\t\t\t\tmargin-left: 2em !important;\n\t\t\t}\n\n\t\t\t.nr-sub-head ol,\n\t\t\t.nr-body ol {\n\t\t\t\tmargin-left: 2em !important;\n\t\t\t}\n\n\t\t\t.nr-body p, .nr-body {margin-bottom: 0px !important;\n\t\t\t\t\tmargin-top: 0px !important;\n\t\t\t\t\t-webkit-margin-before: 0px !important;\n\t\t\t\t\t-webkit-margin-after: 0px !important;\n\t\t\t\t\tfont-family: Arial !important;\n\t\t\t\t\tfont-size: 11pt !important;\n\t\t\t }\n\n\t\t\ttbody {\n\t\t\t\tborder-top: 0;\n\t\t\t}\n\n\t\t\t H1 {font-weight: bold;\n\t\t\t\tfont-size: 16pt;\n\t\t\t }\n\n\t\t\t H2 {font-weight: bold;\n\t\t\t\tfont-size: 12pt;\n\t\t\t }\n\n\t\t\t H3 {font-weight: bold;\n\t\t\t\tfont-size: 11pt;\n\t\t\t }\n\n\n\t\t\t H1.nr-head {\n\t\t\t \t\tfont-family: Trebuchet MS !important;\n\t\t\t \t\tfont-size: 16pt !important;\n\t\t\t \t\tcolor: #3D86C6 !important;\n\t\t\t \t\tfont-weight:bold !important;\n\t\t\t \t\ttext-align:center !important;\n\n\t\t\t }\n\n\t\t\t H2.nr-sub-head {font-weight: bold !important;\n\t\t\t \t\tdisplay: block !important;\n\t\t\t \t\ttext-align: start !important;\n\t\t\t \t\tfont-family: Arial !important;\n\t\t\t\t\tfont-size: 12pt !important;\n\t\t\t }\n\n\t\t\t .nr-body a { font-size: 11pt !important;\n\t\t\t }\n\n\t\t\t TABLE { width: auto!important;\n\t\t\t }\n\n\t\t Nickel One Announces Initial Drill Results from the Tyko Project, including 1.04% Nickel over 16.19m\n Vancouver, British Columbia (FSCwire) - Nickel One Resources Inc. (“Nickel One” or the “Company”, TSXV:NNN) announces the results of initial drilling on its 100%-owned, Tyko Nickel-Copper-Platinum Group Element (“Ni-Cu-PGE”) Project near Marathon in northwestern Ontario. Drill hole TK-16-002 intersected 1.04% Ni over 16.19m from 77.65m to 93.84m downhole (Table 1).\n\n \n\nNickel One’s President and CEO, Vance Loeber commented that: “Assays from the initial four holes from the recent drilling program on the RJ Zone at the Tyko Property, showcase considerable potential for the Project. A new magma conduit model, developed by Fladgate Exploration Consulting, was tested at RJ. Init...