Business

GSP Resource Corp. Outlines 2023 Drill Program Objectives at Alwin Mine Copper-Silver-Gold Project

(TheNewswire) Vancouver, British Columbia – TheNewswire - September ...

articleGsp Resource Corp.September 11, 20235/company/gsp-resource-corp/news/gsp-resource-corp-outlines-2023-drill-program-objectives-at-alwin-mine-copper-silver-gold-project
GSP Resource Corp. Outlines 2023 Drill Program Objectives at Alwin Mine Copper-Silver-Gold Project

About this update from Gsp Resource Corp.

[{"type":"text","content":"GSP Resource Corp. Outlines 2023 Drill Program Objectives at Alwin Mine Copper-Silver-Gold Project\n \n \n (TheNewswire)\n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n Vancouver, British Columbia –\n \n \n TheNewswire -\n \n \n September 11, 2023:\n \n \n GSP Resource Corp. (\n \n \n TSXV:GSPR\n \n \n ) (the “\n \n \n Company\n \n \n ” or\n“\n \n \n GSP\n \n \n ”) announces a detailed summary of the upcoming planned\nFall 2023 exploration program at the Alwin Mine Project (the “Alwin\nProperty”).  The exploration program is being designed to drill\ntest new exploration targets and advance the understanding of the\nstructural controls of known copper zones at the Alwin Property\nlocated in the Highland Valley Copper Camp of British Columbia.\n \n \n \n \n 2023 Drill Program\nobjectives:\n \n \n \n \n \n \n Drilling a minimum of 1,200 m and up to 1,500 m of\ndiamond drilling to test 4 to 6 targets (200 to 300 m per drill hole,\n \n \n Figure 1\n \n \n ), subject to available funds.\n \n \n \n \n \n \n Confirmation drilling of the 5 historic zones (Zone 2\nto 6) to infill 2008, 2020 – 2021 drilling, testing down-dip and\nlateral extensions of mineralization.\n \n \n \n \n \n \n Drill test three new potential copper zones: Northwest,\nSouth and Deep zones (\n \n \n see the\nCompany’s news release dated August 24, 2023).\n \n \n \n \n \n \n Collect structural data using oriented drill core, and\nground truthing of historic surface drill hole locations to continue\nto develop the 3D mineralization model.\n \n \n \n \n \n \n Advance the 3D mineralization model towards completion\nof a potential Mineral Resource Estimate for the Alwin Mine Project\nduring 2024.\n \n \n \n \n \n \n \n \n \n \n \n Click Image To View Full Size\n \n \n \n \n \n Figure 1: Plan Map\nof Surface Expression of Alwin Mine 3D Compilation Showing >1.5%\nCopper Mineralization Vein Model and Potential 2023 Drill\nTargets\n \n \n \n \n GSP’s President & CEO, Simon Dyakowski,\ncommented:\n \n \n “Our team is\nexcited to be advancing the final planning for the proposed 2023\nexploration program to drill test the Alwin 3D copper\n \n \n mineralization vein model for the\nhigh-grade past producing Alwin Copper-Silver-Gold Mine. The broad\nextent of polymetallic mineral...

More updates from Gsp Resource Corp.