Business
Group Eleven Adds Second Drill Rig at Ballywire Zinc-Lead-Silver-Germanium Discovery, PG West Project, Ireland
Group Eleven Adds Second Drill Rig at Ballywire Zinc-Lead-Silver-Germanium Discovery, PG West Pro...

About this update from Group Eleven Resources Corp.
[{"type":"text","content":"\n \n \n \n Group Eleven Adds Second Drill Rig at Ballywire Zinc-Lead-Silver-Germanium Discovery, PG West Project, Ireland\n \n \n /* Style Definitions */\nspan.prnews_span\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\na.prnews_a\n{\ncolor:blue;\n}\nli.prnews_li\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\np.prnews_p\n{\nfont-size:0.62em;\nfont-family:\"Arial\";\ncolor:black;\nmargin:0in;\n}\n.prngen2{\nPADDING-RIGHT:0.17em; PADDING-LEFT:0.17em; BORDER-TOP:black 0pt; BORDER-RIGHT:black 0pt; BORDER-BOTTOM:black 0pt; BORDER-LEFT:black 0pt\n}\n.prnml4{\nMARGIN-TOP:0em; MARGIN-RIGHT:0em; MARGIN-BOTTOM:0em; MARGIN-LEFT:0.33em !IMPORTANT\n}\n.prnbcc{\nBORDER-COLLAPSE: COLLAPSE\n}\n \n \n \n \n \n \n Canada NewsWire\n \n \n \n \n \n \n VANCOUVER, BC\n \n \n ,\n \n \n July 25, 2023\n \n \n /CNW/ - Group Eleven Resources Corp. (TSXV: ZNG) (OTC: GRLVF) (FRA: 3GE) (\"\n \n Group Eleven\n \n \" or the \"\n \n Company\n \n \") is pleased to provide a drill progress update and announce the addition of a second drill rig at the Ballywire Zn-Pb-Ag-Ge discovery (\"\n \n Ballywire\n \n \"), PG West Project (\"\n \n PG West\n \n \", 100%-interest),\n \n Ireland\n \n .\n \n \n \n Drill Update at Ballywire:\n \n \n \n \n \n Two drill holes\n \n have been completed (G11-468-09 and -12), totalling\n \n 375m\n \n and\n \n 323m\n \n , respectively; results are to be announced over the coming weeks upon completion of assays expected in due course\n \n \n \n G11-468-09\n \n was a\n \n 375m\n \n continuation (to a total depth of\n \n 546m\n \n ) of a previous hole drilled by Group Eleven, which had been stopped at\n \n 171m\n \n (see news release dated 21-Jun-2023)\n \n \n \n G11-468-12\n \n was an\n \n 80m\n \n step-out to the east (along strike) of G11-468-06 (which intersected\n \n \n 6.0m\n \n of 8.6% Zn and 3.8% Pb, or 12.4% Zn+Pb, and 68 g/t Ag\n \n ; see news release dated 02-Mar-2023)\n \n \n \n Two drill rigs\n \n are now in operation, with the second rig added last week\n \n \n The Company is currently drilling hole\n \n G11-468-13\n \n (stepping\n \n 50m\n \n north and up-dip of G11-468-12) and\n \n G11-3552-02\n \n (stepping\n \n 150m\n \n south and downdip of G11-468-12)\n \n \n Results from the above holes will be released in due course\n \n \n \n \"We are pleased that drilling is now operational with two rigs a...