Business
GreenLight Metals Intersects 30.7m of 1.05% Cu and 1.34 g/t Au (2.49% CuEq1) Including 14.9m of 1.95% Cu and 1.58 g/t Au (3.65% CuEq) at the Bend VMS Deposit in Wisconsin
Significant visual sulfides encountered in all four holes drilled during the current program Medford, Wisconsin--(Newsfile Corp. - April 27, 2026) -

About this update from Greenlight Metals Inc
[{"type":"text","content":" Significant visual sulfides encountered in all four holes drilled during the current program Medford, Wisconsin--(Newsfile Corp. - April 27, 2026) - GreenLight Metals Inc. (TSXV: GRL) (OTCQB: GRLMF) (\"GreenLight\" or the \"Company\") is pleased to provide an update on the drilling program at the Bend copper-gold VMS Project in Taylor County, Wisconsin. Assay results from the first hole of the 2026 program (B26-007) have been received and confirm the extension of high-grade copper-gold-tellurium mineralization down-dip from mineralization identified during last year's exploration program. To date, a total of four drillholes (1,909 meters) have been drilled along two sections on the Company's leased forty-acre tract of private minerals with the focus of expanding on mineralization encountered during the previous program. All drillholes have encountered significant visual sulfide mineralization expanding the Bend VMS mineralization down-dip and along strike. Assays for holes B26-008 through B26-010 are expected in the coming weeks. Highlights Phase 2 Program On-Going: The planned initial 4,000m portion of the permitted 7,000m Phase 2 drill program is progressing. The program is building on the strong results of Phase 1, further delineating the VMS-style mineralization down-dip and along strike to the east of the main deposit area. Drilling to date confirms mineralization extends eastward along an approximate 45-50° plunge and extends down-dip of B25-004 by a further approximately 110m. Significant VMS mineralization encountered in these initial drillholes remains open at depth and along trend to the east. B26-007: Down-dip extension of mineralization identified from the 2025 drill program (B25-004 - 34.25m of 3.74% copper equivalent (\"CuEq\")1 30.7m of 1.05% Copper, 1.34 g/t Gold, 11.49 g/t Silver, and 139 g/t Tellurium (2.49% CuEq) over the entire mineralized section of massive to semi-massive sulfides and interbedded crystal tuff from 330.59m.2 Including 14.9m of 1.95% Copper, 1.58 g/t Gold, 20.57 g/t Silver, and 227 g/t Tellurium (3.65% CuEq) within the main massive to semi-massive sulfide lens from 338.85m.2 Significant Visual Sulfide Intercepts: B26-007: 50.64m (mineralized interval) consisting of multiple massive to semi-massive sulfide lenses and strongly mineralized interbeds/footwall crystal tuff from 320.49m B26-008: 5...