Business
GreenLight Metals Intersects 22.24 meters of 3.02 g/t Gold and 2.03% Copper (5.27% Copper Equivalent) at the Bend VMS Deposit in Wisconsin
High-Grade Intercept in hole B25-004 includes Visible Gold at 290m; Results Confirm Strengthening...

About this update from Greenlight Metals Inc
[{"type":"text","content":"GreenLight Metals Intersects 22.24 meters of 3.02 g/t Gold and 2.03% Copper (5.27% Copper Equivalent) at the Bend VMS Deposit in WisconsinHigh-Grade Intercept in hole B25-004 includes Visible Gold at 290m; Results Confirm Strengthening Mineralization Down-PlungeMedford, Wisconsin--(Newsfile Corp. - October 21, 2025) - GreenLight Metals Inc. (TSXV: GRL) (\"GreenLight\" or the \"Company\") is pleased to announce additional high-grade Copper and Gold results from its Phase 1 drilling program at the Bend Project in Wisconsin, further to its September 22, 2025 news release reporting results from holes B25-001 through B25-003. The six-hole diamond drilling program, totaling 2,037 meters, was completed from three sites along two sections entirely on the Company's leased forty-acre tract of private minerals. HighlightsPhase 1 Program Complete: Six-hole drilling program successfully completed on schedule, targeting eastern extensions of the known Bend deposit. Drilling confirms mineralization extends eastward along a ~36-42° plunge and remains open at depth and along trend.B25-004: Increase in both grade and thickness of mineralization ~45 meters down dip of previously released hole B25-003 (12.85m of 3.74% CuEq)34.25 meters (drilled thickness) averaging 2.22 g/t Au, 1.35% Cu, 15.62 g/t Ag and 193.22 g/t Tellurium (Te) (3.74% CuEq, not including Te) from 275.25mIncluding 22.24 meters averaging 3.02 g/t Au, 2.03% Cu, 23.53 g/t Ag and 283.08 g/t Te within massive to semi-massive sulfide (5.27% CuEq) from 276.29mLocalized high grade gold intersection within the main sulfide body over 6.10 meters averaging 7.41 g/t Au from 287.9 meters. Visible gold was identified at 290mB25-005: Extension of copper and gold mineralization eastward 57m down plunge of B25-003, 47m along strike of B25-00419.32 meters (drilled thickness) averaging 2.03 g/t Au, 0.78% Cu, 10.12 g/t Ag, 153.73 g/t Te (2.95% CuEq) from 285.83mIncluding 8.79 meters averaging 1.93 g/t Au, 1.64% Cu, 20.31 g/t Ag, 273.48 g/t Te (3.74% CuEq) within massive to semi-massive sulfide zone from 285.83mIncluding 4.00 meters averaging 4.19 g/t Au, 0.1% Cu, 2.03 g/t Ag, 100.70 g/t Te (4.52% CuEq) within footwall crystal tuff from 300mB25-006 (assays pending):Visual results include 17.11m of semi-massive to massive sulfide from 328.52m and 5.42m of heavily mineralized footwall crystal tuff ...