Business

Green River Gold Receives Drill Permit for 6000 Meters of Drilling at the Quesnel Nickel Project and a Bulk Sampling Program

News Release Highlights: A five-year area-based exploration permit has been approved Twenty surficial drill holes of 300 meters each have been approved for 2024

articleGreen River Gold CorpMarch 4, 20243/company/green-river-gold-corp/news/green-river-gold-receives-drill-permit-for-6000-meters-of-drilling-at-the-quesnel-nickel-project-and-a-bulk-sampling-program
Green River Gold Receives Drill Permit for 6000 Meters of Drilling at the Quesnel Nickel Project and a Bulk Sampling Program

About this update from Green River Gold Corp

[{"type":"text","content":" News Release Highlights: A five-year area-based exploration permit has been approved Twenty surficial drill holes of 300 meters each have been approved for 2024 A 3,999 tonne bulk sampling program has been approved Multiple trenches have been approved Edmonton, Alberta--(Newsfile Corp. - March 4, 2024) - Green River Gold Corp. (CSE: CCR) (OTC Pink: CCRRF) (the \"Company\" or \"Green River) is pleased to announce the application to expand mineral exploration activities at the Company's 100% owned Quesnel Nickel Project has been approved. About Green River Gold Corp's Exploration Plan The Company's mineral exploration permit has been approved for 5 years, valid until Feb 28, 2029. The exploration team will first target Zone 1 with infill drilling to complete an NI 43-101 compliant resource estimate. The trenching and bulk sampling will be undertaken to obtain samples for metallurgical, mineralogical and processing testing. The main focus of this year's exploration program will revolve around achieving the following primary objectives listed below: Follow up the man-portable drill program via step-out drilling and begin to delineate the true size of this potential deposit. Complete the required amount of infill drilling needed to complete the NI 43-101 compliant resource estimate. Expand and better define the orientation and distribution of the higher-grade ultramafic-hosted nickel mineralization. Expand the known footprint of the at-surface Zone 1 mineralization containing nickel, magnesium, and other important critical minerals. Attempt to locate the source of the metallic vein which was intersected by WK-23-01 in 2023. (See previous press release on June 12, 2023. \" Green River Gold Provides Drilling Update and Reports Assay Results from the Alteration Zone of Drill Hole WK-23-01, Including 7583 Grams per Tonne Zinc, 4340 Grams per Tonne Lead, 5.3 Grams per Tonne Silver, and 0.158 Grams per Tonne Gold.\") The bulk sampling program will focus on the nickel and magnesium potential , but will also be used to study the metallurgy of the local talc deposit in Zone 1. The rock samples will be sent to the metallurgy lab to analyze the recovery rate of magnesium, by HCL leaching test (HCL), high-pressure carbonic acid leaching (HPAL) and high-pressure CO2 leaching test. Assays to date have shown an average of approximately 21% magnesi...

More updates from Green River Gold Corp