Business

Green Bridge Metals Commences Diamond Drilling Program at the Titac Project, Minnesota, USA

VANCOUVER, BC / ACCESS Newswire / January 22, 2026 /Green Bridge Metals Corporation (CSE:GRBM)(OTCQB:GBMCF)(FWB:J48)(WKN:A3EW4S) ("Green Bridge" or the "Company") is pleased to announce the commencement of a diamond core drilling program at its Titac ...

articleGreen Bridge Metals CorporationJanuary 22, 20265/company/green-bridge-metals-corporation/news/green-bridge-metals-commences-diamond-220000782
Green Bridge Metals Commences Diamond Drilling Program at the Titac Project, Minnesota, USA

About this update from Green Bridge Metals Corporation

[{"type":"text","content":"VANCOUVER, BC / ACCESS Newswire / January 22, 2026 / Green Bridge Metals Corporation (CSE:GRBM)(OTCQB:GBMCF)(FWB:J48)(WKN:A3EW4S) ("Green Bridge" or the "Company") is pleased to announce the commencement of a diamond core drilling program at its Titac Project, part of the Company's South Contact District in northeastern Minnesota, U.S.A. (Figure 1).","length":375,"tagName":"p"},{"type":"text","content":"The program represents the first phase of targeted drilling designed to evaluate and expand on copper mineralization associated with the Titac South deposit, which hosts an existing titanium dioxide mineral resource, as outlined in the NI 43-101 Technical Report dated September 18, 2024, prepared for the Company by Apex Geoscience (and available on the Company's profile at www.sedarplus.ca)¹.","length":399,"tagName":"p"},{"type":"text","content":"CEO COMMENTARY","length":14,"tagName":"p"},{"type":"text","content":"David Suda, President and Chief Executive Officer, stated:","length":58,"tagName":"p"},{"type":"text","content":""The commencement of drilling at Titac is an important milestone for Green Bridge as we begin systematically testing the copper potential of a project that already hosts a titanium resource. Titac is a highly prospective system, and this program allows us to follow up on compelling historic data while applying modern exploration techniques to advance the project in a disciplined and responsible manner."","length":416,"tagName":"p"},{"type":"text","content":"PROGRAM OVERVIEW","length":16,"tagName":"p"},{"type":"text","content":"The Phase 1 drill program has been designed to systematically test copper mineralization identified in historic drilling but not previously evaluated as a primary exploration focus.","length":181,"tagName":"p"},{"type":"text","content":"Key parameters of the program include:","length":38,"tagName":"p"},{"type":"list","items":[{"val":[{"type":"text","content":"Holes planned: six (6) diamond core holes.","length":42,"tagName":"p"}]},{"val":[{"type":"text","content":"Target depth: approximately 300 meters.","length":39,"tagName":"p"}]},{"val":[{"type":"text","content":"Total planned drilling: approximately 1,800 meters.","length":51,"tagName":"p"}]},{"val":[{"type":"text","content":"Average hole spacing: approximately 50 meters.","length":46,"tagName":...

More updates from Green Bridge Metals Corporation

Green Bridge Metals CorporationGreen Bridgetitanium dioxideTitac SouthThe Companymineral resourcediamond core drillingCompanymineralizationTechnical Reportcopper