Business

5.9 meters @ 14.4 g/t AuEq Intercepted at Great Pacific Gold's Wild Dog

Vancouver, British Columbia--(Newsfile Corp. - November 10, 2025) - Great Pacific Gold Corp.&#xA0...

articleGreat Pacific Gold Corp.November 10, 20254/company/great-pacific-gold-corp/news/59-meters-144-gt-aueq-intercepted-at-great-pacific-golds-wild-dog
5.9 meters @ 14.4 g/t AuEq Intercepted at Great Pacific Gold's Wild Dog

About this update from Great Pacific Gold Corp.

[{"type":"text","content":"5.9 meters @ 14.4 g/t AuEq Intercepted at Great Pacific Gold's Wild DogVancouver, British Columbia--(Newsfile Corp. - November 10, 2025) - Great Pacific Gold Corp. (TSXV: GPAC) (OTCQX: GPGCF) (FSE: V3H) (\"Great Pacific Gold,\" \"GPAC,\" or the \"Company\") announces results from its expanded Phase 1 diamond drill program at its flagship Wild Dog Project (\"Wild Dog\" or the \"Project\"), located on the island of New Britain, East New Britain Province, Papua New Guinea (\"PNG\"). The Phase 1 program is focused on the Sinivit target, a portion of the 15km Wild Dog epithermal structural corridor.Key Highlights:WDG-12 intercepted two well mineralized structures:First Structure: 5.9 m @ 14.38 g/t AuEq from 123.2m (14.0 g/t Au, 0.18% Cu, 12.4 g/t Ag);Including: 2.5m @ 32.0 g/t AuEq from 126.6m (31.3 g/t Au, 0.28% Cu, 24.7 g/t Ag).Second Structure: 5.8 m @ 6.15 g/t AuEq from 177m (5.1 g/t Au, 0.54% Cu, 15.4 g/t Ag);Including: 3.0 m @ 10.9 g/t AuEq from 179m (9.1 g/t Au, 0.96% Cu, 28.5 g/t Ag).WDG-13 completed and intersected two mineralized zones characterised by quartz-sulphide veining and brecciation. Assay results are pending, and WDG-14 is currently in progress, targeting depth and strike extensions of the same structural corridor (see Figures 5 and 7).Second drill rig mobilization update: the second drill rig (dual purpose sonic / diamond) has been shipped and is on route to the project site. Camp construction for the expanded drilling crew is well underway with drilling expected to begin in December 2025.LiDAR survey results received: The program generated a Digital Terrain Model with sub-10 cm vertical accuracy, providing critical topographic control for geological modelling, drill planning, and infrastructure layout. The dataset is currently being further analyzed and used to support structural mapping and refine target definition across the broader Wild Dog district.\"The Sinivit target on the Wild Dog epithermal structural corridor continues to deliver high-grade results. In addition, we are starting to build an advanced understanding of the structural controls for mineralization at Sinivit. Holes WDG-08, 12 and 13 define a coherent high-grade pod within the broader Sinivit structure, with WDG-14 underway and continuing to test this area. Mineralization beneath the Northern Oxide area (10, 10A and 11) appears weake...

More updates from Great Pacific Gold Corp.