Business
Granite to Expand Southern Nevada Water Infrastructure with Addition of Rice Pumping Station
WATSONVILLE, Calif., June 25, 2025--Granite (NYSE:GVA) is proud to announce its continued collaboration with the Southern Nevada Water Authority (SNWA) and Contri Construction Company through the award of the Rice Pumping Station & Pipeline Project—part of the Horizon Lateral Program. In partnership with Contri, Granite operates under the Southern Nevada Construction Partners (SNCP), a joint venture.
About this update from Granite Construction Incorporated
[{"type":"image","alt":"","displaySize":"","headline":null,"caption":"","credit":null,"className":"","disableSlideshowImg":false,"size":{"original":{"width":2650,"height":402,"url":"https://media.zenfs.com/en/business-wire.com/d974d2eb35f71ff7a51ef4363a5204b6"},"resized":{"url":"https://s.yimg.com/ny/api/res/1.2/wjhOmhNtK.dKCYpZ4xUxoQ--/YXBwaWQ9aGlnaGxhbmRlcjt3PTk2MDtoPTE0NjtjZj13ZWJw/https://media.zenfs.com/en/business-wire.com/d974d2eb35f71ff7a51ef4363a5204b6","width":960,"height":146},"lightbox":{"url":"https://s.yimg.com/ny/api/res/1.2/CcUjgwcbrWv1.9j4yRxUDw--/YXBwaWQ9aGlnaGxhbmRlcjt3PTI0MDA7aD0zNjQ7Y2Y9d2VicA--/https://media.zenfs.com/en/business-wire.com/d974d2eb35f71ff7a51ef4363a5204b6","width":1200,"height":182}},"lazy":false},{"type":"text","content":"WATSONVILLE, Calif., June 25, 2025--(BUSINESS WIRE)--Granite (NYSE:GVA) is proud to announce its continued collaboration with the Southern Nevada Water Authority (SNWA) and Contri Construction Company through the award of the Rice Pumping Station & Pipeline Project—part of the Horizon Lateral Program. In partnership with Contri, Granite operates under the Southern Nevada Construction Partners (SNCP), a joint venture.","length":424,"tagName":"p"},{"type":"text","content":"The Horizon Lateral Program is a strategic initiative designed to enhance system reliability, redundancy, and long-term water delivery capabilities to SNWA facilities, serving the Las Vegas Valley Water District and the City of Henderson. The program is being delivered through a staged design and construction approach, with the Rice Pumping Station & Pipeline Project among the first to advance into detailed design and construction.","length":439,"tagName":"p"},{"type":"text","content":"The project scope includes the construction of a new 30 million gallons per day (MGD) pumping station at the existing Thomas Rice Reservoir and Pumping Station site. Additionally, a 21,000-linear-foot, 42-inch diameter steel water pipeline will be installed to convey water southwest to the Spring Mountain/Durango Reservoir site.","length":330,"tagName":"p"},{"type":"text","content":""This project exemplifies our commitment to building resilient infrastructure that supports the long-term water needs of Southern Nevada," said Chris Burke, Granite Vice President of Regional Operations. "We’re honored to continue our collaboration w...